USACERL Technical Report 95/31

September 1995

Pilot Test of the Knowledge Worker System (KWS) at Ft. Eustis, VA

by Linda McCarthy, Kevin Stewart, Ginna Moore, David Tomlinson, and Wayne Schmidt

ABSTRACT

Many Army personnel can be classified as knowledge workers - people who produce not tangible products, but some form of processed or enhanced information. Ongoing research at the U.S. Army Construction Engineering Research Laboratories (USACERL) is resolving problems of information access and management for knowledge workers, with the goal of developing a comprehensive performance support environment for this group.

The Knowledge Worker System (KWS) is a performance support environment designed to help government knowledge workers organize and coordinate their work by storing task scheduling informationin a centralized data base. KWS tracks scheduled events, lists completed events, and outlines the steps necessary to complete forthcoming tasks. This project demonstrated the ability of KWS Version 1.6 to implement process improvement through a pilot test of the system at Fort Eustis, VA. This test formed a basis for developing a model for application of KWS to new areas, defining the relationships between business process improvement and KWS, and developing a strategic plan for broader KWS implementation.

Back to Table of Contents

Back to KWS Home Page


FOREWORD

This study was conducted for the Defense Logistics Agency under Military Interdepartmental purchase Request (MIPR) No. DLAH-92-ZRM-206. The technical monitors were Harriet Reofrio, DLA-ZI and Richard Reynal, ATZF-EHP

The work was performed by the Business Process Division (PL-B) of the Planning and Management Laboratory (PL), U.S. Army Construction Engineering Research Laboratories (USACERL). Moonja P. Kim is Acting Chief, CECER-PL-B, L. Michael Golish is Acting Operations Chief, and David M. Joncich is Acting Chief, CECER-PL. The USACERL technical editor was William J. Wolfe, Technical Resources.

COL James T. Scott is Commander and Acting Director of USACERL, and Dr. Michael J. O'Connor is Technical Director.

Back to Table of Contents

Back to KWS Home Page


1 INTRODUCTION

Background

Many Army personnel can be classified as knowledge workers - people who produce not tangible products, but some form of processed or enhanced information. Army knowledge workers perform tasks that are driven by Department od Defense (DOD) deadlines, workgroup coordination, and ad hoc events. These knowledge workers make decisions that significantly impact organizational resources and are themselves a significant and costly resource.

The Corporate Information Management (CIM) initiative, undertaken by the Director of Defense Information (DDI) in the Office of the Assistant Secretary of Defense for Command, Control, Communications and Intelligence, seeks a major re-engineering and restructuring of DOD business methods and processes (DOD Directive 8020-1). Two measures inaugurated by DDI to assure CIM program objectives involve reducing costs of information technology implementation through standards and expediting CIM programs by providing evolutionary organizational training methods. Business can be re-engineered by using an Integrated Computer-Aided Manufacturing Definition (IDEF) to model business processes and highlight areas where improvements will have the highest pay-off. However, new information technology alone is only part of business re-engineering. Information technology must also be closely tied to the process improvements, information flows and decision processes.

Ongoing research at the U.S. Army Construction Engineering Research Laboratories (USACERL) is resolving problems of information access and management for knowledge workers, with the ultimate goal of developing a comprehensive performance support environment for this group. The Knowledge Worker System (KWS) is a performance support environment designed to help government knowledge workers organize and coordinate their work by storing task schedule information in a centralized data base. KWS tracks scheduled events, lists completed events, and outlines the steps necessary to complete forthcoming tasks.

KWS functions as an automated performance support environment (PSE), comprised of an integrated set of automation systems, that guides Army action officers through the course of their daily tasks by helping them organize, prioritize, and execute their work efficiently and effectively. KWS enhances productivity and reduces stress in an event-driven, high-demand environment by:

The Knowledge Worker System can provide the needed link between the disparate parts of information technology. KWS can play an integral part of the CIM business re-engineering process; as part of the CIM program, it can help meet the need for a wide range of functional process improvements and training requirements by providing institutional knowledge on an as-needed, individualized basis. KWS Version 1.6 is currently in the pilot phase of development. A final version is planned for release in the fiscal year 1996 (FY96).

Back to Table of Contents

Back to KWS Home Page


Objective

The goal of this project is to demonstrate the ability of KWS to implement opportunities for process improvement through pilots. These pilots serve as a basis for developing a model for application of KWS to other areas, defining the relationships between Business Process Improvement and KWS, and a strategic plan for broader implementation.

Approach

A pilot site was selected according to established criteria. With the selection of a pilot site and the specific offices at that site to implement, interviews were done to gather information about the processes performed at those particular offices. The information gathered from the interviews were input into the Knowledge Worker System data base for use by the knowledge workers at the pilot site. KWS was installed at the pilot site, training was conducted, and support visits were made. After the program was put into use, an evaluation of the system was done and recommendations were made regarding the continued development of KWS and its use at Fort Eustis.

Scope

KWS uses institutional knowledge capture for Business Process Improvement. When a process is changed it is captured in KWS for future use. KWS continues the decomposition of processes done in IDEF. IDEF decomposes at a high level, KWS decomposes at a lower level. The combination of these two covers all processes at all levels.

Back to Table of Contents

Back to KWS Home Page


2 SITE SELECTION

Overview

Several agencies, both governmental and nongovernmental, were involved in executing this project. In order to coordinate activities between them, a Concept of Operations was created, including: Participants and Roles, Tasks and Task Schedule, and Specific Responsibilities. Figure 1 shows the Task Schedule used. The three steps to selecting the site(s) were:

  1. Develop a Work Plan,

  2. Determine Performance Metrics, and

  3. Determine the Pilot Site(s).


Figure 1. Task 1 (prototype) schedule.

Develop Work Plan

A work plan was developed with the constraint that the project had to be complete by 1 Jun 93. It was recognized that this did not allow for a thorough evaluation of the results. Estimates of the impact would have to be used in the report. Concurrently with the development of a work plan, the KWS demonstration program and executive overview program were revised. These were developed to better brief future KWS participants.

Back to Table of Contents

Back to KWS Home Page


Determine Performance Metrics

On completion of the project work plan, the next task was to determine the performance metrics - how success would be measured. USACERL has an ongoing, multi-year KWS research project on how to measure productivity and productivity increases among knowledge workers. One method being investigated is the use of Work Profile Analysis developed by Dr. Peter G. Sassone of Ga. Tech.(Sassone 1987). In this method, the knowledge worker's activities are broken down into work categories. The worker then keeps a daily time log of his/her activities. A tally of the logs ultimately reveals how much time knowledge workers spend, on average, performing each work category. An analysis is then made to see if knowledge workers are spending a majority of their time performing the tasks for which they were hired. For example, such an analysis might be used to determine if a manager is spending more time supervising and decisionmaking, or doing clerical duties. The Work Profile Analysis requires significant time to determine the work categories, to build the time logs, and then to analyze the results. This project's relatively short time line did not allow it to be used.

Another method of determining performance metrics is to measure the differences in time it takes to accomplish a task (Thomas, Baron and Schmidt 1995). After determining the events, tasks, or steps that a knowledge worker performs (part of building the knowledge base), the knowledge worker relates how long it takes to accomplish a task or step before KWS is installed. A distinction is made between waiting time (the time waiting for someone else to perform their task) and the time the knowledge worker spends performing an activity. After the installation of KWS, the knowledge workers are surveyed for the time to perform a task. The change in time is then multiplied by the knowledge worker's wage rate and by the number of occurrences of the task per year, resulting in an annual productivity increase figure. This method was selected for this project. (There is potential for more in depth study in this area, particularly in measuring the benefit of KWS to a new knowledge worker's learning curve.)

Back to Table of Contents

Back to KWS Home Page


Determine Pilot Site(s)

A set of selection criteria was written to aid in finding the best pilot site (Appendix A) and the criteria were weighted by level of importance (critical, important, or nice to have). The criteria included physical (hardware/software, location), political (enthusiasm, top management support), and resource characteristics (completeness of IDEF models, automated data processing [ADP] support, etc.). The methodology for selecting a site was to:

  1. Determine selection criteria (Appendix A)
  2. Apply the criteria to the pool of potential sites
  3. Select a pilot site
  4. Determine the functional area to implement

The initial pool of sites consisted of those sites conducting the Functional Process Improvement Plan (FPIP) through the office of the Director of Defense Information (DDI). The site's IDEF and Activity Based Costing models were reviewed to select a subset of sites with the best IDEF model factors for implementing KWS. Additional information was gathered about the site to better judge the Site Related Factors.

A two day review was conducted by representatives from DLA, Dynamic Research Corporation (DRC), and USACERL of over 30 IDEF model reports covering over 15 potential sites. DIS and OASD Ambulatory Health Care scored the highest in the review. The detailed results of this review are in Appendix B.

After this review another possibility was brought to our attention. The U.S. Army Corps of Engineers Engineering and Housing Support Center (EHSC) (now the U.S. Army Center for Public Works [USACPW], 7701 Telegraph Road, Alexandria, VA 22312-3862) had performed a detailed IDEF and ABC analysis of the Directorate of Engineering and Housing (DEH) at Ft. Sill. In addition, earlier IDEF modeling had been performed as part of the development of the Integrated Facilities System - Mini/Micro (IFS-M). There are 119 DEHs worldwide that all perform the same functions. This potentially large audience would allow for tremendous savings in acquiring process information.

Two potential DEH sites were then considered, Ft. Sill and Ft. Eustis. While Ft. Sill had just recently performed detailed IDEF and ABC models and Ft. Eustis had not, it was decided that the functions performed by both were similar enough that a majority of the Ft. Sill study was applicable to Ft. Eustis. Given this assumption, the IDEF model factors were judged to be equal. Ft. Eustis was selected over Ft. Sill because there of its top management support (EHSC, TRADOC, and the DEH), because the user hardware was partially present, and because a computer network already existed.

Having determined the site, it was then necessary to identify potential KWS implementation opportunities in the DEH/DPW environment. To do this the Fort Sill Activity Based Costing Project Report dated May 1992 was used as a theoretical model of the DEH business. The first step was to evaluate the identified improvement opportunities (IOs) (Appendix C). One hundred twenty-three IOs were eliminated as outside the scope of KWS because the IO recommended changes in physical environment, regulation, policy, personnel, and/or ADP systems unrelated to KWS.

The remaining IOs were then grouped by subject area in order to determine the subject areas with the most potential for improvement (Appendix D). Those subject areas with the most IOs and/or greatest potential dollar savings were then considered: Provide Administrative Support, Train Personnel, and Process In-House Work Order. The two subject areas with the greatest identified potential dollar savings were Process In-House Work Order and Process Service Order.

The first subject area we considered was Process In-House Work Order. This subject area has the most IOs and the biggest identified potential dollar savings. However, there is a risk of duplication of effort in this subject area because of the extensive automation help already provided to the work reception office and shops through IFS-M. More importantly, KWS currently emphasizes cyclical, complex tasks; rather than highly structured tasks that occur multiple times a day, such as work order reception. These tasks are more suited to conventional automation.

On briefing the KWS concept to EHSC, TRADOC, and Ft. Eustis DEH representatives, the area of work orders was again mentioned. The Production Control Shop is an area within the Ft. Eustis DEH that deals with work orders and customer service and is the most important area within the DEH environment. A more detailed look at this area identified several tasks that would benefit from KWS implementation. Four people within the Production Control Office were selected: the Chief Estimator, a Work Control Technician, a Scheduler and an Estimator.

The area of Real Property and Space Utilization was also recommended because it is an area that is gaining in significance due to BRAC. As the Army is reduced in size and reorganized, this area is becoming more and more burdened with work. It is also an area where currently little automation help has been provided. Three people within the Real Property/Space Utilization were selected: the Real Property Officer and two Real Property Clerks.

Both of these areas involve the general work areas of Provide Administrative Support, Oversee Performance of Activities, and Train Personnel. Future areas of opportunity within the DEH would be to select the DEH office, the Engineering Resource Management Division (ERMD), and Engineering Plans & Services (EP&S). Implementing KWS in these offices would provide process improvement in the areas of Provide Administrative Support, Budget/Account for Operations, Oversee Performance of Activities, Process Construction Work Order, and Train Personnel. These offices contain a large percentage of knowledge workers in the DEH/DPW organization. Their tasks are often complex and cyclical in nature, involve coordinating work among many individuals, are generic across DEH/DPWs, and frequently access many diverse data bases.

Back to Table of Contents

Back to KWS Home Page


3 PROPOSED/PILOT-TESTED KWS IMPLEMENTATION METHODOLOGY

Kickoff Meeting

With the selection of a pilot site and the specific offices in which to implement the system, an initial briefing should be conducted at the site with the implementation coordinator, the participant's supervisors, and the participants. This meeting will demonstrate KWS and review the installation plan. The installation plan is a schedule of the interviews, installation, training, and support visit(s).

At Ft. Eustis, the initial briefing was conducted at the site with Michael Mitrione from DRC; Kevin Stewart and Linda McCarthy from USACERL; the implementation coordinator, Michael West; the participant's supervisors, Edward Edwards and Rufus Byrd; and the participants, Carolyn Prokup, Kathy Mueller, James Brown, Marge Zolinski, and Angelyn Risher from Ft. Eustis. At this meeting, KWS was demonstrated and the schedule of activities was reviewed.

Build Knowledge Base

The IDEF models will be used during the interviews as a starting point and to help the interviewees see where they belong in the business process of the installation. Three interviews are planned using two interviewers. (At Ft. Eustis, two interviews were done using two interviewers.) The interviewers must have an understanding of both the information required by KWS and the capabilities of Do Its.

The goal of the initial interview is to give interviewees an opportunity to freely talk about their jobs. This allows the participants to lay a foundation for understanding the general activities performed by the knowledge worker, to offer suggestions on improvement opportunities, and to give interviewees a feeling of ownership in the KWS process. Another goal of this interview is to identify the opportunities for Do Its.

The interviewers should then take the information gathered and fit it into the IDEF model. Typically the IDEF model's detail extends only to the Task level and does not extend to Steps. In preparing for the second interview the interviewer tries to add detail to the IDEF model and to organize the information gathered in the first interview into the IDEF model. The interviewer also identifies potential Do Its and the unknown ADP information needed to create the Do It.

The second interview should be more structured; it involves presenting the information gathered during the first interview with the goal of correcting errors and adding depth to the information. This can be done by updating the IDEF models. The interviewers at this time should also collect information necessary to construct the Do Its (for example, to identify the fields from IFS-M that would appear in specific reports, review copies of reports and forms, and locate files).

Due to the shortness of the overall schedule at Ft. Eustis, only one week lapsed between the first and second interviews. More time would have allowed a better opportunity to prepare for the second interview so that consequently, needed ADP information for the construction of the Do Its had to be gathered through telephone calls, faxes, and another site visit.

Following this interview, the builders of the knowledge base put the information into the Event/Task/Child Task/Step structure of KWS using the forms contained in Appendix E, "Building the KWS Data Base". By this time, all information for the Do Its and Attachments should be gathered and the final interview should be conducted. This step may be done through telephone calls and faxes. The goals of this interview are to confirm the Event/Task/Step accuracy, gather the remaining KWS data requirements (i.e., assignments, dependencies, priorities, frequencies, etc), and gather the before-performance metrics information on the Tasks/Steps (Appendix H).

By this time, all data, forms, and files will have been collected. The Do Its are constructed using the selected tool set (i.e. batch files, macros, programs, etc). The Do Its are tested externally to KWS, and are then tested within KWS. Any Do Its created for another installation that are applicable to the current site should be used.

At Ft. Eustis, the Do Its were constructed using the toolset of VistaCom scripts, WordPerfect macros, 1-2-3 macros, batch files, Clipper programs, and dBase data files. The Do Its were tested externally to KWS, then within KWS. No Do Its created for other installations were applicable to this site (Appendix I).

The knowledge base can now be built, and should be completely entered into the data base (with appropriate due dates, frequency of occurrence, durations, etc.) and assigned to the appropriate people for accomplishment. The Do Its and Attachments are attached to the proper Task or Step.

Back to Table of Contents

Back to KWS Home Page


Installation

At this point, the installation of KWS at the pilot site is ready for completion. The knowledge base has been input into the KWS Task Data Base and backed up. The server is now ready to be shipped to the site. Two people proficient in Oracle and computer hardware/software should then visit the site to install the server and the KWS software on the participants' machines. They will then test the system to make sure everything is running as it should.

Because Ft. Eustis did not already have user workstations, the installation ocurred in two phases. First, the user workstations were purchased, configured, and installed for the users before the commercial Windows training. Appendix J lists the equipment purchased. Part of the installation included providing a means for the users to continue "business as usual" (i.e., executing old DOS applications from within Windows).

Then the knowledge base was input into the Oracle server and backed up, and the server was shipped to Ft. Eustis. Two people proficient in Oracle and computer hardware/software then went to the site and installed the server and the KWS software on the participants machines

Training

The participants are trained in two phases. Phase one provides commercial training in the use of Microsoft Windows if the staff are not already familiar with Windows. Appendix F includes a course outline. On completion of this training, the KWS users are allowed several weeks to get comfortable with the Windows environment.

After the users are comfortable with the Windows environment, two days of KWS training is conducted, using their database for the" hands on" portion of the training. An outline of the course is in Appendix G. During the training it is emphasized that they need to customize their KWS knowledge base. They need to add depth and extend the knowledge base as they use it. Or as procedures or information flows change this needs to be reflected in the knowledge base. Thus accomplishing instantiation of organizational and/or procedural changes. It is crucial that the KWS users understand this KWS knowledge extension is central to process improvement.

Back to Table of Contents

Back to KWS Home Page


Support Visits

When training is complete, an immediate support visit is necessary to resolve any problems participants have using KWS, and to fix Do Its. The visit should occur within two weeks after the training. Another support visit may occur in another month or so depending on the problems that occur. At Ft. Eustis, the follow-up support visit occurred at the same time as the evaluation visit because of the relatively short time frame of the project.

Evaluation

After the knowledge workers have had at least a month to use the system, it is appropriate to begin doing an evaluation. (At Ft. Eustis, the evaluation process was begun after two weeks.) Measurements will be taken on how long it now takes to perform tasks and users will also be asked whether they sense that their work has become more efficient using KWS. The users will also be asked to suggest changes or enhancements to the system. A complete evaluation of the pilot study at Ft. Eustis has not been completed; however, for four of the Do Its for three people, there is projected annual savingsof about $25,000 (Figure 2).


Figure 2. Projected KWS productivity improvement at Ft. Eustis

Back to Table of Contents

Back to KWS Home Page


4 RECOMMENDED KWS SITE INSTALLATION METHODOLOGY

Lessons Learned

The experience gained during the pilot study done at Ft. Eustis was used to modify the proposed KWS installation methodology for use at other installations. The recommended methodology includes the following changes:

  1. An Installation Coordinator should be designated to facilitate coordination between the implementation team and the knowledge workers. This person would be responsible for providing local resources to the implementation team, including, but not limited to: conference room reservations, A/V equipment, training facilities, workspace for the team, and coordinating TDY visits.
  2. The implementation team requires a dedicated KWS workstation configured identically to that of the future Knowledge Workers, and with the same external connectivity (i.e. IFS-M connection). This workstation should also be set up to allow for remote access by the implementation team. This would require: 1) Norton PC Anywhere, 2) 9600 Baud Modem, and 3) a dedicated phone line for the modem.
  3. The implementation process requires a dedicated, direct network-to-network mail connection between the implementation team's home and the installation. This would facilitate building the knowledge base (by allowing e-mail to be used to clarify data), would ease program installation (by allowing e-mail of changes in executable program code), and would help coordinate activities between the implementation team and the knowledge workers.
  4. Beyond the criteria listed in Appendix A, the site's network and workstation hardware/software needs to support shared resources (i.e. Laser Printer and file service), network mail, and Windows versions of any user software. If any required hardware and software must be purchased, enough time must be allowed for delivery, installation, and training.
  5. The installation and the implementation team must specify an implementation agreement outlining the responsibilities of each party and a simple mechanism for changing the agreement.

Back to Table of Contents

Back to KWS Home Page


Site Selection

A candidate site for KWS implementation should do an IDEF analysis as part of the Functional Process Improvement Plan (FPIP) or apply the IDEF model of a similar organization. For example, the Ft. Eustis DPW could use the Ft. Sill DPW IDEF model. Also the IDEF "As Is" model should be evaluated for potential Improvement Opportunities that can be addressed by KWS.

These improvement opportunities should be analyzed in order to select the offices that would benefit from the installation of KWS. When evaluating improvement opportunities the following factors should be considered:

  1. Whether the areas/processes that offer immediate savings

  2. Whether the activities are non-site specific

  3. Whether the activities access multiple sources of data

  4. Whether the improvements are measurable

  5. Whether the tasks are programmable

  6. Whether the tasks are complex

  7. Whether the tasks are cyclic

  8. Whether there is high turnover in the job(s) targeted for analysis;

  9. Whether there is data exchange between KWS processes.

When identifying potential site locations to which an existing IDEF model can be applied, the criteria should include:

  1. Political support (enthusiasm, top management support)

  2. Physical configuration (hardware and software)

  3. Resources (ADP support).

Back to Table of Contents

Back to KWS Home Page


Coordination Meeting

A coordination meeting should be conducted with organizational hierarchies to develop the installation plan. The plan should minimally:

  1. Schedule activities

  2. Identify the Installation Coordinator and designate responsibilities

  3. Identify the Implementation Team Coordinator and designate responsibilities

  4. Identify hardware/software to be purchased

  5. Identify resource requirements

  6. Provide a mechanism for changing the schedule

  7. Specify a mechanism for determining who should pay for unexpected requirements

  8. Designate responsibilities for support after the installation.

Kickoff Meeting

With the selection of a pilot site and which offices to implement, a kickoff meeting should be conducted at the site with at a minimum, the implementation coordinator, the participant's supervisors, and the participants. The meeting should include:

  1. Introductions

  2. A KWS demonstration

  3. A review of the site installation plan, modified as needed.

Back to Table of Contents

Back to KWS Home Page


Determine Performance Metrics

The method(s) for measuring success for the implementation of KWS need to be determined. The metrics selected should be as quantifiable as possible even though some areas will be subjective (e.g., quality). Other metrics to be considered include:

  1. Time to perform tasks

  2. Quantity of work produced

  3. Resources required to complete individual tasks

  4. Time spent waiting for someone else to finish related tasks

  5. Quality of work produced

  6. Learning time for new employee and/or new tasks

  7. Skill requirements to accomplish tasks.

The metrics must be determined before the interviews so that the interviewers can gather the information needed for the "before picture." (After the installation, people will often forget what things were like before KWS.)

Back to Table of Contents

Back to KWS Home Page


Build Application Knowledge Base

To build the knowledge base for KWS, the implementation team must define the Event/Task/Child Task/Step hierarchy, identify attachments, and develop Do Its. The task hierarchy needs the following data that are not provided by the IDEF models:

  1. Schedule information (cycles, durations, date due, frequency, etc)

  2. Priority

  3. Who tasks are assigned to and performed by.

While building the knowledge base, the processes, tasks, and steps must continuously be analyzed for more efficient, cost effective ways to perform the process, task, or step. Improvements could result from:

  1. Rearranging the sequence of steps taken to complete the task

  2. Eliminating non-value-added steps

  3. Taking advantage of technological advances in hardware/software

  4. Eliminating "bottlenecks".

The KWS implementaion process requires an interview location that offers privacy and isolation, but that is also close enough to individual work stations to allow easy demonstration of new processes in the target work environment. If possible, a direct e-mail connection should be in place to allow easy dialogue between the participants and the implementation team. Again, the implementation team will need a dedicated workstation at the installation to give the interviewers a place to record the collected data and a workstation to test and demonstrate without displacing participants.

The implemantation team must be prepared tio conduct an iterative set of structured interviews to obtain an in-depth understanding of tasks to be performed. Three interview sessions are recommended to compile the required information. The interviewer(s) need to have an understanding not only of the information required by KWS, but also of the capabilities of Do Its and how to construct them. Important factors to consider during an interview are:

  1. Giving interviewees an opportunity to freely talk about their jobs

  2. Taping the interview session (if there are no objections)

  3. Scheduling interviews to fit interviewees' schedules

  4. Making sure questions are clearly understood

  5. Paraphrasing long answers with short restatements of facts

  6. Using open-ended questions to discover attitudes and opinions

  7. Using closed ended questions to identify or clarify specific facts

  8. Obtaining specific examples where appropriate

  9. Documenting the results of all interviews.

The IDEF models will be used during the interviews as a starting point and to help the interviewees see where they belong in the business process of the installation. They should be studied before hand to develop a "strawman" of the task hierarchy. Structure the interview questions to focus on identifying all tasks and performance metrics associated with a given process.

If the selected site is similar to a previously installed version of KWS, then the previous knowledge base should be used as a basis to build on. The events and the first levels of the task structure should be the same. What will change will be step level information, work flow assignments, and the Do Its.

During the initial interview, the goal is to give the interviewee an opportunity to freely talk about his/her job. This allows the interviewer(s) and interviewee to lay a foundation for understanding the general activities performed by the knowledge worker, offer suggestions on improvement opportunities, and to give the interviewee a feeling of ownership in the KWS process. Another goal of this interview is to identify the opportunities for Do Its.

The interviewer(s) should then take the information gathered and fit it into the IDEF model. Typically the IDEF model's detail extends only to the Task level and does not extend to Steps. In preparing for the second interview, the interviewer(s) tries to add detail to the IDEF model by putting into a simple flowchart, and to organize the information gathered in the first interview into the IDEF model. The interviewer also identifies potential Do Its and the unknown ADP information needed to create them.

The second interview should be more structured and should involve presenting the information gathered during the first interview with the goal of correcting errors and adding depth to the information. This can be done by updating the flowcharts previously done from the IDEF data. The interviewer(s) at this time should also collect information necessary to construct the Do Its (for example, by identifying the fields from IFS-M might appear in specific reports, reviewing copies of reports and forms, and locating files).

Following this interview, the builders of the knowledge base put the information into the Event, Task, Child Task, Step structure of KWS using the forms contained in Appendix E, "Building the KWS Database". All information for the Do Its and Attachments should now be gathered.

The final interview should then be conducted. This step can be performed through the use of telephone calls, faxes, and/or e-mail. The goals of this interview are to confirm the Event/Task/Step accuracy, gather the remaining KWS data requirements (i.e. assignments, dependencies, priorities, frequencies, etc), and gather the before performance metrics information on the Tasks/Steps.

Where domain-specific Do Its exist in reuse libraries, determine applicability to the KWS tasks being developed at the current site. All data, forms, and files have been collected. Any new Do Its are constructed using the selected tool set (i.e. batch files, macros, programs, COTS, etc). The Do Its are tested external to KWS then tested within KWS.

When these steps are complete, the Knowledge Base can be built. The knowledge base should be completely entered into the data base (with appropriate due dates, frequency of occurrence, durations), and assigned to the appropriate people for accomplishment. The Do Its and attachments are associated with the proper Task or Step.

Back to Table of Contents

Back to KWS Home Page


Installation

If the site is acquiring user hardware and/or software for the KWS implementation, the installation of that equipment should occur at the earliest opportunity. The user should be given as much time as possible to become familiar with the Windows environment and the Windows applications. Part of the installation of the Windows environment should be to provide the users with a means to do business as usual. The user should be allowed to move to the new environment as they feel comfortable. It is important to recognize that the user needs to still perform their old job until the new KWS environment is installed.

The installation of KWS at the pilot site should be completed prior to KWS training. The knowledge base should have been input into the KWS Task Data Base and backed up, and then the server should be shipped to the site. Two people proficient in Oracle and computer hardware/software should then visit the site and install the server and the KWS software on the participants machines. They will then test the system to make sure everything is running properly.

Training

Participants should be trained in two phases. Phase one will include commercial training in the use of Microsoft Windows and any new Windows applications, if users are not already familiar with Windows and/or the new application(s). On completing this training, the KWS users should be given several weeks to get comfortable with the new environment.

Once users are comfortable with the Windows environment, two days of KWS training is conducted, using the current data base for " hands on" training. The training should emphasize the need to customize the KWS knowledge base - to add depth and extend the knowledge base as it is used. As procedures or information flows change, these changes need to be reflected in the knowledge base, thus dynamically instantiating organizational and/or procedural changes into the knowledge base. It is crucial that the KWS users understand that KWS knowledge extension is central to process improvement.

Back to Table of Contents

Back to KWS Home Page


Maintenance Support

When training is complete, an immediate support visit is necessary to help resolve any problems participants may have using KWS and the Do Its. This visit should occur within two weeks after the training; subsequent monthly visits may occur until the system stabilizes. Early support should be provided by the implementation team.

A long-term plan for maintenance support should be formulated either through onsite or contract personnel. The support should minimally provide:

  1. Server/workstation hardware/software support and updates

  2. KWS program updates

  3. New user training

  4. Do It maintenance and creation

  5. Expansion of KWS applications.

Evaluation

Based on the performance metrics selected, each Event/Task should be evaluated. After the knowledge workers have had at least a month to use the system, it is appropriate to begin doing an evaluation. Depending on the type of metrics selected prior to installation, the appropriate measurements are taken. At least measurements should be taken on how long it now takes to perform tasks. Users should also be asked what new tasks they have time to do now that they are using KWS. The users will also be asked for any changes or enhancements needed for the system. The results of the analysis should be documented and saved for later use.

Back to Table of Contents

Back to KWS Home Page


Update "To Be" Model

The information gathered during the KWS installation should be used to update the "To Be" model. If a "To Be" model has not been developed, the "As Is" model should be modified to reflect the changes.

Document and Catalog Do Its

It is important to document and catalog the new Do Its into domain-specific reuse libraries, especially if the same KWS functionality is to be installed at multiple locations (e.g., facility management at various DPWs). These libraries support reuse and may also:

  1. Provide a baseline from which to analyze site activities

  2. Provide a basis for comparative analysis of similar processes

  3. Help to evolve "ideal" processes across DOD

  4. Maintain an audit trail of process changes.

Continuous Process Improvement

Periodic review of other related KWS projects, will lead to improvement opportunities within the organization. Technology, directives, and procedures will always be changing over time. KWS processes, tasks, and steps should be reviewed for potential improvements.

Back to Table of Contents

Back to KWS Home Page


5 CONCLUSIONS AND RECOMMENDATIONS

This study demonstrated the ability of the Knowledge Worker System to implement opportunities for process improvement through a pilot test of KWS at Ft. Eustis, VA. This pilot test will serve as a basis for developing a model of application of KWS at other Army installation and to other areas of application.

It is concluded that the Events, Tasks, and Child Tasks developed for Ft. Eustis are likely to translate directly to other installations and areas of application. it is also concluded that the extension of the pilot work done in developing the steps and Do Its at Ft. Eustis to other DEHs may be indirect; the principles underlying the creation and application of KWS were shown here to be sound and generally applicable, but individual steps and Do Its may be specific to an installation or application area. While all DEHs perform the same processes, they accomplish those processes in different ways using different tools. For example, while Ft. Eustis uses Lotus 1-2-3 (spreadsheet program) and WordPerfect (word-processing software); other organizations might use Microsoft Excel and Word. Such difference would necessarily impact the Do Its. The other impact would lie in the area of size and diversity of organization. Larger installations might split tasks differently. This kind of impact would require less effort than the changes in Do Its.

In this pilot test, KWS has shown itself to be an extension to the Business Process Improvement Program (BPIP). By providing a direct means to implement new processes within an organization and to provide process improvement at the execution level, KWS provides a more direct means of change than through the publication of additional regulations and policies. Changes in procedure are reflected in their individual To Do list.

It is recommended that the Knowledge Worker System be further implemented at Ft. Eustis. The system was well received by Ft. Eustis personnel; both the Commander and Deputy Commander have expressed interest in expanding the scope of KWS implementation to include more offices. Like many Army installations, Ft. Eustis is currently undergoing reduction in force and reorganization. It is also recommended that the Installation Methodology outlined in Chapter 4 of this report be taken as a working strategic plan for expanding the use of KWS to other installations. Expanded use of KWS would not only continue the productivity improvements measured in this study, but would also provide a unique opportunity to:

Back to Table of Contents

Back to KWS Home Page


APPENDIX A - SELECTION CRITERIA

HARDWARE/SOFTWARE REQUIREMENTS FOR KNOWLEDGE WORKER SYSTEM (KWS) SITE

1. Oracle Server Requirements

a) Hardware

CPU - Any ORACLE-certified multi-processor platform.

Memory - Minimum of 16 Megabytes of RAM is recommended.

Disk - 200 Megabytes of disk space on Disk 1 (above the operating system) is required. 400 Megabytes is recommended.

Network - Interface networking hardware supported by LAN.

Tape Backup Unit.

Example - One of our current servers has the following:

CPU: 386/33

Etherlink: 8 bit (plan to upgrade to 16 bit)

RAM: 10M (plan to upgrade to 16M)

HD size: 320M

Tape: Arc60 (plan to upgrade to Exabyte 2.5)

Tape Controller: Emulex 1B02B (plan to upgrade to Adaptec 1542B)

Vaines: 4.11(5)

b) Software

LAN Software

TCP/IP - Ability to use SQL*Net TCP/IP (e.g., for Banyan Vines, the TCP/IP routing option must be purchased from Banyan.)

Any LAN software required for access to Oracle

Ability to access InterNet

2. Client Requirements

a) Hardware

CPU - 386 or higher with 20MHZ CPU to run MS Windows 3.1 in enhanced mode.

RAM - Minimum of 5 MB is recommended; 10 MB is better.

HD - Min. of 40 MB recommended (Windows 3.1 and KWS together require 15M. Network client software and memory manager require additional space.)

Mouse - Required.

Monitor - VGA required.

b) Software

MS-DOS 5.0

Microsoft Windows 3.1

Memory manager such as QEMM or 386MAX is recommended to load the network drivers into upper memory to leave the space for SQL*Net driver and MS Windows 3.1.

Drivers to access Oracle server (E.g., Oracle SQL*Net driver for Banyan Vines).

Capability to run TCP/IP version of SQL*NET.\

PILOT SITE SELECTION CRITERIA


Criteria                                          		Necessity *                   

Enthusiasm of site                                                              

	Top management support                    		C                             

	Users have time to work with developers   		C                             

Completeness of IDEF models                       		C                             

IDEF models in electronic form                    		N                             

Opportunities for Process Improvement                                           

	Potential for big improvement           		C                             

	Processes already identified             		I                             

	Process automation analysis already done  		N                             

	Can use pre-exiting tools/DoIts         		I                             

Availability of onsite ADP support                		I                             

User and server hardware/software                 		C                             

Location                                          		C                             



* - C = Critical, I = Important, N = Nice to Have


                   Factors                                 	Metric               

1.  Management Support                                	 Y      N      ?          

2.  User Interface with Developers                 	 N/A (Site Selection)        

3.  User/Server Hardware & Software        		Y      N      Partial       

4.  Available ADP Support On-Site                   	N/A (Site Selection)        

5.  Location (DC Area)                                    Y      N              

6.  IDEF Model Detail (# Levels)                      	1,  2,  3  ...  n         

7.  Existing "To -Be" Model             		Y      N              

8.  Improvement Potential                           	N/A (Site Selection)        

9.  Processes for Improvement Identified          	Y      N              

10. pre-existing Tools or do Its                    	N/A (Site Selection)        

11. Automation Analysis Done                              Y      N              

12. Activity Based Costing Done                           Y      N              



High-Level Site Evaluation Criteria

Back to Table of Contents

Back to KWS Home Page


APPENDIX B - REVIEW OF POTENTIAL SITES

Table B1. Potential sites.

Table B1. (Cont'd)

Table B1. (Cont'd)

Back to Table of Contents

Back to KWS Home Page


APPENDIX C - FT. SILL IMPROVEMENT OPPORTUNITIES

TEAM INTERVIEW COMMENTS

Numbered Improvement Opportunities

From Ft. Sill

March 19, 1992

IMPROVEMENT OPPORTUNITIES

1. Develop a software package with commonly used standard forms available on disk and ready for use. Use for SF1034. Establish computer templates for the following documents used in the JOC and Inspection branches: DD1155 Contractor payroll (as many as 70 a month), DD1354 Real property, Eng93 Pay application, and SF40 Modification forms. AD

2. Encourage the processing of suspenses. Suspenses are not handled in a timely manner or have unrealistic response dates. AD

3. encourage people to answer their electronic mail in a timely fashion. AD

4. Establish preventative maintenance measures for computer hardware. AD

5. Bill yearly for customers whose bill is $25 or less per month. AD

6. Provide more autonomy to the Co-Located DOC. This includes control of various logs and the ability to print all contract documents locally instead of at DOC headquarters. AD

7. Eliminate unnecessary and redundant reports such as the Tech Data Report, Behickle Usage Report, and Copier Usage Report. Also, consider a reduction in the level of detail associated with some reports such as the Deadline Report. Supply has five 4-door cabinets filled with old receipts that need to be microfiched, eliminated or archived on computer tape. Don't file useless data. Eliminate "AUTODIN" print-outs; not used. Eliminate "Depot Status Cards" from DOL. Various Environmental performance measurement reports don't seen to be used; eliminate. AD

8. Provide DOC with more space to accommodate the level of paperwork they generate particularly to handle the year-end rush. AD

9. Improve work environments. For example, inadequate lighting and inadequate receiving ramp. AD

10. Improve information system capabilities and responses to eliminate the existence of various manually maintained logs. AD

11. Eliminate unnecessary copying. AD

12. Provide more administrative and secretarial support. Some organizations have to share secretaries. Need better definition of requirements and expectations. Other potential related issues are filtering junk mail and distribution of mail. AD

13. Update phone system. Include use of 1-800 numbers without the need for access codes. Implement voice mail system to support information distribution. Need autodial capability. Need upgraded telephone system (rotary now) with switchboard to handle volume of calls and to route calls in Family Housing. AD

14. Adopt bar code data entry. Locate the appropriate supply clerk between FMS and DOC. AG

15. Let a driver pick up locally expedited materials, not the workers. AG

16. Use supplies recovered during recycling (rubber bands, paper clips, etc.). AG

17. Establish more aggregate contract. Gas chlorine and liquid alum are examples. AG

18. Locate data transcription closer to the warehouse. Too many keying errors. Look at bar-coding and do away with data transcriber function. AG

19. Reduce the frequency of preparation of Form 250, Material Inspection and Receiving Report, in departments other than Supply. AG

20. Establish simple system for local and self-service purchases. Credit cards, for instance provide self-service for office supply. Allow more people access to self-service store. AG

21. Reduce the number of brands of equipment purchased to minimize amount of spare and/or replacement parts required. AG

22. Raise authorization for Blanket purchase Agreements from $1,000 to $2,500 as provided by FAR. Provide BPA authority to each shop for their top 2 03 items. AG

23. A Rolodex file for often used supplies is an effective way to index items by description rather than by NSN or MCN. Scrub Stock and Fringe Catalogs. AG

24. Provide safety shoe allowances or vouchers. Do away with the property book officer processing requisitions for safety shoes when the PBO orders the shoes. AG

25. Improve responsiveness of procurement process. Part of the problem is providing enough information on requests to order supplies or services. Also, supply personnel do not check on status of orders until order is 45 days or more old. Supply requests go through too many hands. Materials sold after in storage for more than a year. Not enough supply people during peak periods to handle needs. Priority system is abused; everything is hot. Because preventive maintenance is not being regularly performed, equipment breaks requiring priority requisitions to return equipment to operational status. Not clear on rules for contacting suppliers. Source identification can be a problem leading to unnecessary order cancellations or the purchase of inferior product. Units of issue are not always considered when supplies are ordered (lumber). Supply system works on 30-day cycles, DPW works in hours or days when responding to emergencies. Too many organizations and people are involved in process. AG

26. Automatically generate late delivery letters on letterhead. AG

27. Install a PC with printer to generate partial purchase receipts/redos. This now requires loading and aligning the printer. AG

28. Hire more people in Supply. Takes too long at counter to obtain supplies. AG

29. Replace old material handling equipment. AG

30. Consolidate all storage under one 100,000 square foot roof. AG

31. Determine value of IFS-M to supply. No perceived need. AG

32. Service requests (including rentals of equipment, etc.) have no transaction register captured in FESS; only SAILS captures the delivery of the service. Services are more time consuming, many times needing Contracting involvement. Extensions of service require another set of documentation. AG

33. FESS isn't utilized to its fullest extent; e.g., ASRs are converted into #3953s. Skip ASR and allow electronic changes to the #3953 (since funds are already authorized by the ASER). AG

34. Supply Division and DOC log similar data; provide means to enter data only once for both systems (FESS and SAACON). AG

35. Avoid duplicate obligations; e.g., three items ordered and four received, and the fourth is allowed to be kept as the order quantity. AG

36. Establish an automated system for authorizations, that considers the Common Table of Allowances and Table of Distribution Allowances. Avoid delays for items like Environments 15 cubic yard dump truck. AG

37. The FESS to SAILS data feed is approximately two days behind affecting responsiveness to correcting problems. This process should be improved. AG

38. SAACON needs to be expanded to support the needs of large supply, services, and construction contracting. AG

39. Provide better understanding of Budget and Administration systems. Need empathy for line people. BD

40. Budget re-approval cycle has too much paperwork and too many memos. BD

41. The DPW needs to have the authority to purchase its own ADP equipment without going through Directorate of Information Management (DOIM). BD

42. Authorize signatory authority (up to $5000) for certain Engineering personnel when unforeseen problems arise during ongoing projects. CO

43. Establish better coordination between DPW personnel, contractor representatives and facility managers. CO

44. JOCs are great for shortening time, but impact statements and reviews by regulatory agencies take time. We can't always expedite! Some of this activity appears too expensive. How can we get the flexibility of JOC at the price of doing the work inhouse? CO

45. Make contract modifications become effective on the first of the month. The administrative cost of initiating a modification is $250 per modification. CO

46. Let contractors type and submit their own DD250's (request for payment). Standardize the payroll form for all contractors. CO

47. Improve the time required by Environmental to perform assessments for projects. Some contracts have been sent to DOC without them (with permission from the Colonel and Dennis) but these assessments are supposed to be completed before the project goes to DOC. CO

48. Design for support maintainability; that is, 19 year old soldiers, e.g., vandal-proof latrines. Bench buildings for design excellence. CO

49. The instability in the Project Priority list causes general productivity loss. Dollars have too much impact but do not necessarily reflect reality. Need should carry more weight in establishing priorities. Too many people have the authority to create changes in the priority list: Colonel, Deputy director, Business Management, Facilities Maintenance and Engineering Chief. CO

50. Schedule design reviews (by Colonel or Wayne Kiser) at 30% and 70% of completion, instead of when designs have been completed. CO

51. The year-end "use it or lose it" philosophy creates costly work and disturbs priorities. CO

52. Provide better contract specifications and definitions to minimize the need for modifications after contract award. CO

53. Need to reorganize project folders. Folders are becoming too large to handle. CO

54. Provide standard contract specifications on engineering PC's to reduce review and development time. Need additional CADD software. Provide temporary secretarial help during periods of heavy specification writing. During the period of May-July, current secretary spends up to 90% of her time doing nothing but processing specifications. CO

55. Reduce the amount of time engineering spends on inspection documentation and/or provide inspectors with tools to expedite the documentation process (hand held tape and video recorders). CO

56. Need to update engineering data standards, databases and floor plans. CO

57. Release environmental money (free to FT. Sill). EN

58. Submit supply installation description, etc. only once a year. (Reference Pest Management Plan to TRADOC). EN

59. Establish a building (structure) history system to keep records of application and to establish audit trails. Look into the Navy system for pest control inventories. EN

60. Ensure Maintenance works on fire equipment first, as required by fire prevention regulations. Provide mechanics trained to work on fire equipment. Do preventive maintenance on fire equipment instead of waiting until equipment fails. provide training to firemen to perform preventive maintenance. FD

61. Clear up confusion over responsibilities for hazardous materials emergencies between Fire Department and Environmental Department. FD

62. Improve the fire extinguisher control and servicing process. Shouldn't have to replace so many extinguishers. Fire extinguishers are supposed to remain with real property. FD

63. Pay firemen for overtime at regular overtime rates. FD

64. Should have specialists or fully trained firemen to do alarm maintenance. FD

65. Add Fire Department personnel to meet regulation-based manpower levels. FD

66. Expand Fire stations to accommodate current equipment. FD

67. Include fire department in standard billeting upgrade considerations. Firemen sleep at the fire stations. Quarters are cramped, old and have limited restroom facilities. FD

68. Implement a computer-aided dispatch system. FD

69. Replace alarm system (currently telephone-based) with radio controlled version. FD

70. Eliminate fire reports on fires of limited damage. Establish a higher dollar threshold, currently reporting on all fires involving damage greater the $1. FD

71. Buy commercial fire fighting equipment instead of Mil Spec equipment. Don't purchase prototype equipment until tested for use. FD

72. Provide housing with authority over construction projects from conception through completion. HO

73. Time is lost bringing HOMES system up and taking it down. HO

74. Hire more people in Housing and provide necessary training. HO

75. Provide funding for upgraded equipment (HVAC, shower pans, roofs). HO

76. Eliminate waste associated with accounting for cost per dwelling unit in family housing. HO

77. Provide access to Post Locator to find military personnel. HO

78. Improve the HOMES system. System response time is very slow. HO

79. Eliminate time card and L&E handling problems and improve dial up reliability. LB

80. Integrate IFS-M and STARSIPS. Use system to pose L&Es. Eliminate redundancy between L&Es and time cards. Computerize time cards. LB

81. Upgrade Personal Computer capabilities (need more speed). MI

82. Fix Supply computer terminal (possible cable problem). MI

83. Investigate the use of CD ROM to replace microfiche (AMDF) manipulation. MI

84. Provide a modem for dial-up to other depots (like with GSA). HO

85. Purchase IP Plot ($180 each and 4 needed). HO

86. Purchase additional/improved computer software and hardware. MI

87. Reduce "unit of issue" to "unit of order" conversion errors. MI

88. Reduce the use of carbon-back computer paper within the installation. Many reports are sent to recycling without ever being decollated, obviously copies were never used. MO

89. Investigate the usage of 80-column cards within the installation. Is anyone using them? MO

90. Maintain a level of shop stock in Data systems for repair of computer hardware. MO

91. DPW assumed additional responsibilities without additional help. OV

92. Establish one hour lunch period; it would be a morale booster. OV

93. Establish better coordination with AG personnel. There is a duplication of responsibilities between the DPW Cemetery Administration and the AG's Casualty Office. Need additional authority over grounds personnel who are assisting in the cemetery. Takes too many people and shops to bury someone. OV

94. Accept advice and respect expertise of housing chief and staff. OV

95. Determine value of Special Duties program. Time is being spent picking up and delivering SD prisoners to work sites. OV

96. Provide road-worthy vehicles to Environmental. OV

97. Accomplish all design work in-house. this would give DPW total control over projects and the work could be done faster and cheaper. OV

98. Determine whether unused copier paper is being recycled. OV

99. Improve timeliness of information flowing through the organization. Need to get performance appraisals and suspenses on time and accurately. Many times suspenses arrive after the due date. OV

100. Make the Director a civilian position. OV

101. Improve coordination between departments and divisions. Different divisions work on same projects without knowledge of the other. There is a lack of communication with management. BMD should work more closely with the shops, instead of simply dictating responses. Departments/divisions should help solve each other's problems in addition to identifying them. Some organizations are perceived to be a nuisance within DPW. Get more recognition outside the organization than within. There doesn't seem to be equal sacrifices when times get hard. Accept the opinion and advise of Environmental on environmental issues. OV

102. Reach decisions at meetings. Provide effective meeting training. OV

103. assign and coordinate work better. Actions are moved instead of fixed in place to make people happy. too much time spent duplicating, verifying and checking each others work. People ask questions that they should research themselves. People should be responsible for their own mistakes. Instructions should be written down. System checks and balances should be left to do their work, and there shouldn't be so much second-guessing. Have to log-in/log-out correspondence to fend off accusations of non-responsiveness. OV

104. Provide a work-at-home program, with computers tied into system through modems. OV

105. Don't always have the right equipment to do jobs right. Plumbers have the only back hoe and have to schedule its use. OV

106. Establish a Long Range Plan for ADP with milestones. OV

107. Determine whether number of people sufficient to accomplish expected level of efforts. OV

108. Provide vehicle maintenance in a timely manner. OV

109. Provide beepers to all crews working at remote sites. OV

110. Pay on improvement ideas in a timely manner. OV

111. Do away with the internal controls program documentation. This is only a paperwork shuffle. OV

112. Get Supply out of the temporary loan business (for lawn maintenance equipment). Give an allotment of equipment maintenance to self-help. PB

113. Improve the time it takes HVAC to repair/salvage appliance property book items. PB

114. Encourage Housing to keep new/replacements item instead of replacing because of aesthetics. PB

115. Incident information should be directly entered onto Report of Surveys; i.e., generated by the person who is responsible for the damage. PB

116. Increase the amount/cost of hand-receipt items to more realistic levels. Improve hand-receipt procedures. PB

117. Establish a common stacking adapter for bunk beds so that one type would support all type beds. Could save money and provide a safer fit. PB

118. Centralize storage equipment to reduce quantities required. PB

119. Automate the sub hand-receipt process at the section level. PB

120. Issues vouchers/kits to each craftsman for durable hand tools. Develop a kit of tools for each craft. PB

121. Avoid moving furniture during unit moves. Use built-in wardrobes, for instance. PB

122. Use bar-coding for check-out/check-in of FMO property items. PB

123. Receipt of a property book item (from hand-receipt) should automatically update its issue; re: Facilities Engineering Property Book system. PB

124. Support in-house personnel in their pursuit of licenses with awards or reimbursements. PR

125. Reduce the time it takes to secure appropriated-funded personnel. PR

126. Reduce the use of IOC employees. IOC employees cause problems with regularly employed personnel. Need to hire them as either part or full time employees. PR

127. Manpower authorizations should be controlled better. Go to Management to the Civilian Budget MCB) system. Lift manpower constraints. Manpower and Staffing Standards, Work Measurement, Manpower Studies go away and hire people based on what the dollars and workload demands. PR

128. Performance appraisals are counter-productive. PR

129. Ensure that Service Orders have customer phone numbers. SO

130. Reduce the number of Service Orders recorded incorrectly. SO

131. Establish a better system for handling customer service. SO

132. Completed Service Orders can be re-opened if one member of crew does not indicate Service Order completion. SO

133. Provide more training for firemen. TR

134. Send current personnel to real property management seminars (1 week). TR

135. Need fire fighter training area. Current area closed by EPA. TR

136. Do more cross-training between branches. Increase understanding between branches regarding responsibilities and operations. TR

137. Have training classes for supervisors on how to complete performance appraisals correctly. TR

138. Establish training program for hiring and training environmental rookies. TR

139. Provide education and training within the directorate for Time Cards, L&Es, Service Orders, Work Orders, Contract Administrator, and Correspondence. TR

140. Provide customer service training for personnel. TR

141. Provide annual technical training for employees. TR

142. Conduct on-site Corp of Engineers General Construction School for inspectors/monitors on a regular basis (every 1 or 2 years). Also provide training in negotiation techniques. TR

143. Allow Environmental to estimate asbestos removal requirements or train Estimators to do this function efficiently and effectively. WO

144. Work with Housing to educate housing occupants regarding what constitutes an emergency. Most night calls are not emergencies. WO

145. Work with State Historical Preservation Organization (SHIPO) to improve the time required to approve design work on buildings over 50 ears old. WO

146. Need to reduce time housing units are under maintenance. WO

147. Reduce the time and effort required to track and process work orders. Need in ensure that work orders are not closed without work actually be accomplished. Too many old work orders in system. A significant number or work orders are no longer valid. Need to better understand the work order priority system. WO

148. Do a better job of understanding customer requirements and of identifying work scopes at job sites. WO

149. Increase Work Order thresholds from $750 to $1,000. WO

150. Avoid duplication of effort between Program Managers, Foremen, and Estimators. Establish a scheduler position that schedules, provides time lines, schedules weeks in advance and not weekly. WO

151. Develop a Sportsman customer database that serves multiple retail applications; e.g., like a customer and invoicing database. WO

152. Relocate emergency WO phone responsibility. Firemen have little understanding of the nature of facilities emergencies such as plumbing, roofing, heating; and are not skilled to deal with these problems. WO

153. Provide data recorder for Engineering Division. this will allow for generation of topographic drawings from data recorder. WO

154. Need multi-craft people to do one stop fixes. WO

155. Establish better ad hoc query access to obtain analytical information. WO

156. Improve timeliness of information in IFS-M. Currently manual logs are maintained to ensure currency of information. WO

157. Improve the synchronization between work orders in IFS-M and FESS. WO

SUBJECT AREAS

AD Provide Administrative Support

AG Acquire Supplies & Services

BD Budget/Account For Operations

BQ Provide Bachelor Quarter Occupancy

CO Process Construction Work Order

DG Develop Guidance

EN Protect The Environment

FI Inspect Facilities

HO Provide Family Housing Occupancy

IH Provide Internment Services

LB Report Actual Labor And Expenses

MB Prepare For Mobilizations & Disasters

MD Develop Information Technology

MI Implement Information Technology

MN Perform Minor Maintenance/Housekeeping

MO Operate Information Technology

OV Oversee Performance Of Activities

PB Provide Reusable Items

PR Administer Personnel Programs

RC Receive Guests and Visitors

RL Maintain Customer Relations/Awareness

RP Maintain Real Property Configuration

SO Process Service Order

TB Troubleshoot Problems And Issues

TC Provide Technical Assistance

TR Train personnel

WO Process In-House Work Order

Back to Table of Contents

Back to KWS Home Page


APPENDIX D - FT. SILL SUBJECT AREAS

IMPROVEMENT OPPORTUNITIES BY SUBJECT AREA

Subject Area 						Potential Yearly Cost 											Savings
							in 1,000 dollars
AD Provide Administrative Support
1 - Computerize Standard Forms 				400
2 - Expedite Suspense Processing 			(undetermined)
4 - Establish PM for Computer Hardware 			(undetermined)
5 - Bill Yearly for Small Customers 			178
10 - Eliminate Manual Logs 				(undetermined)
12 - Provide Admin/Secretarial support 			(undetermined)
AG Acquire Supplies & Services
25 - Improve Procurement Process 			(undetermined)
26 - Automatic Late Delivery Letters 			45
32 - Service Requests Integration (FESS/SAILS) 		93
37 - Improve FESS to SAILS Integrations 		93
BD Budget/Account for Operations
39 - Establish Budgeting/Admin System Knowledge 	(undetermined)
40 - Reduce Budgeting Re-approval Paperwork 		(undetermined)
BQ Provide Bachelor Quarter Occupancy
CO Process Construction Work Order
43 - Coordination with Construction./
	Facility Managers 				680
52 - Prepare Better Contract Specs 			129
DG Develop Guidance
EN Protect the Environment
FI Inspect Facilities
HO Provide Family Housing Occupancy
IH Provide Internment Services
LB Report Actual Labor and Expenses
MB Prepare for Mobilizations & Disasters
MD Develop Information Technology
MI Implement Information Technology
MN Perform Minor Maintenance/Housekeeping
MO Operate Information Technology
OV Oversee Performance of Activities
99 - Improve Information Flow 				(undetermined)
101 - Improve Department/Division coordination 		(undetermined)
103 - Assign/Coordinate Work Better 			(undetermined)
104 - Provide Work-At-Home Program 			(undetermined)
PB Provide Reusable Items
123 - Auto Property book Items Issue/receipt 		174
PR Administer Personnel Programs
125 - Reduce personnel hiring Time 			(undetermined)
RC Receive Guests and Visitors
RL Maintain Customer Relations/Awareness
RP Maintain Real property Configuration
SO Process Service Order
130 - Eliminate Incorrect SO Entries 			8478
131 - Great Customer Service System 			8764
TB Troubleshoot Problems and Issues
TC Provide Technical Assistance
TR Train Personnel
136 - Cross-train Branch Personnel 			(undetermined)
137 - Performance Appraisal Training 			(undetermined)
138 - Establish Environmental Training Program 		(undetermined)
139 - Training Time/L&E/SO/WO 				(undetermined)
140 - Provide Customer Service Training 		(undetermined)
141 - Provide Annual Technical Training 		(undetermined)
WO Process In-House Work Order
147 - Reduce WO Tracking/Processing 			8816
148 - Improve Work Scope Definition 			316
150 - WO Process Duplication of Effort 			436
154 - Need Multi-craft People 				8505
155 - Establish Information AdHoc Query Access 	225
156 - Improve IFS-M Information Timeliness 		(undetermined)
157 - Synchronize WOs in IFSM/FESS 			73

Based on the above analysis, the subject areas with the greatest potential cost savings are "Process In-House Work Order" and "Process Service Order". The subject areas with the most improvement opportunities are "Provide Administrative Support", "Train Personnel", and "Process In-House Work Order".

Back to Table of Contents

Back to KWS Home Page


APPENDIX E - BUILDING THE KWS DATABASE

Event Name: ____________________

_________________________________


                              Date                                     Date       
Tasks                         Due        Subtasks                      Due        
                                                                                  
                                                    
                                         
                                         
                                         
                                         
                                         
                                         
                                         
                                         
                                         
                                                                                  
                                                    
                                         
                                         
                                         
                                         
                                         
                                         
                                         
                                         
                                         
                                                                                  
                                                    
                                         
                                         
                                         
                                         
                                         
                                         
                                         
                                         
                                         
                                                                                  
                                                    
                                         
           
           
           
           
           



SUBTASK:

ASSIGNED BY:

ASSIGNED TO:

PERFORMED BY:

SKILL LEVEL:

DATE DUE: / / DURATION:

DEPENDENCIES:

Predecessors:

Successors:

PRIORITY: (Please check one)

Critical

Important

Normal

STATUS: (Please check one)

Not Started

Started

Completed

OBE

FREQUENCY OF OCCURRENCE: (Please check one)

Ad Hoc

Cyclic (Please check one)

weekly

monthly

quarterly

yearly

TOOLS:

Software:

Data:

Access Path:

Authorizations:

STEPS:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

Back to Table of Contents

Back to KWS Home Page


APPENDIX F - PROSOFT WINDOWS 3.1 COURSE OUTLINE

MICROSOFT WINDOWS

DESCRIPTION

Microsoft Windows 3.1 is a desktop work environment. Microsoft Windows' graphical user interface (GUI) allows the user to perform tasks by pointing and clicking rather than typing in cryptic DOS commands.

STUDENT SKILLS

PREREQUISITES

None

COURSE LENGTH: 1 Day

SOFTWARE VERSION: Windows 3.1

MICROSOFT WINDOWS

STUDENT OUTLINE

I. Overview of Microsoft Windows

A. Graphical User Interface

B. Running Windows

1. Real Mode

2. Standard Mode

3. Enhanced Mode

C. Getting Help

D. Exiting Windows

II. Windows Screen

A. Desktop

B. Windows

1. Title Bar

2. Minimize and Maximize Boxes

3. Control Box

4. Scroll Bars

C. Icons

D. Menus

E. Dialog Boxes

III. Program manager

A. Running programs or Applications

B. Switching Between Programs

C. Task List

IV. File Manager

A. Switching Drives

B. Directories

1. Making and Removing

2. Directory Window

3. Options

C. Searching for Files

D. Selecting Files

E. Moving Files

F. Copying Files

G. Deleting Files

H. Formatting disks

I. Copying Diskettes

V. Control Panel

A. Screen Colors

B. Desktop Pattern, Wallpaper, and Screen Saver

C. Printers

VI. Print Manager

VII. Clipboard

A. Copying to the Clipboard

B. Passing from the Clipboard

VIII. Introduction to Microsoft Windows Accessory Programs

A. Write

B. Paintbrush

C. Notepad

D. Cardfile

E. Calendar

F. Clock

G. Games

IX. Review

Back to Table of Contents

Back to KWS Home Page


APPENDIX G - KWS COURSE OUTLINE

COURSE OUTLINE

(Real Property Team)

Day 1 Monday, May 3, 1993

TIME SUBJECT

0800 Introduction

0900 The TODO Window

Navigation

Add/Modify/Delete

Command Menu

1030 FILE Command Menu

1100 Navigate via the Event Manager

1130 Summarize & Answer Questions

1200 Lunch

1300 Introduction/Review

1330 Add/Modify/Delete Official Task in Event Manager

1430 Attachments (Basic)

1530 Review of Day 1

DAY 2 Tuesday, May 4, 1993

0800 Review of Day 1

0830 Do Its (Basic)

0900 Personal Preferences

1000 Advanced Attachments/Note

1100 Advanced DO ITs

1200 Lunch

1230 Predecessors/Successors

1300 Work Groups

1330 Queries

1400 Changing Levels

1430 Cyclic Tasks/Events

1500 Other Features

1530 Summary of Training

DAY 3 Wednesday, May 5, 1993

0800-1000 Walkthrough of Knowledge Base

Conducted with trainees in individual work areas

NOTE: The instructors will be available through the week to answer specific questions about the knowledge base in use in the functional areas.

COURSE OUTLINE

(Production Control Team)

DAY 1 Wednesday, May 5, 1993

TIME SUBJECT

0800 Introduction

0900 The TODO Window

Navigation

Add/Modify/Delete

Command Menu

1030 FILE Command Menu

1100 Navigate via the Event Manager

1130 Summarize & Answer Questions

1200 Lunch

1300 Introduction/Review

1330 Add/Modify/Delete Official Task in Event Manager

1430 Attachments (Basic)

1530 Review of Day 1

DAY 2 Thursday, May 6, 1993

0800 Review of Day 1

0830 Do Its (Basic)

0900 Personal Preferences

1000 Advanced Attachments/Note

1100 Advanced DO ITs

1200 Lunch

1230 Predecessors/Successors

1300 Work Groups

1330 Queries

1400 Changing Levels

1430 Cyclic Tasks/Events

1500 Other Features

1530 Summary of Training

DAY 3 Friday, May 7, 1993

0800-1000 Walkthrough of Knowledge Base

Conducted with trainees in individual work areas

NOTE: The instructors will be available the remainder of the day to work with you on specific functional areas with KWS.

Back to Table of Contents

Back to KWS Home Page


APPENDIX H - FT. EUSTIS TASK DURATIONS (BEFORE)

COORDINATE WORK


Customer Generate Work Order                                    Duration                 

	Receive 4283                                       	5days, 4hours            

		1. Verify 4283                                  2hours                   

		2. Route to Environmental Office          	2.5days                  

		3. Route to Safety Office                   	2.5days                  

		4. Input 4283 into IFSM                      	2hours                   

Establish & Maintain Work Request                                                           

Provide Work Status                                                                         

	Produce Production Shop Report (weekly)            	2days                    

		Generate Draft Report                                                                       

			1. Print draft copy of report         	5hours                   

		Get New Information                                                                         

			1. Have Chief, Production Control Section 
				update draft             	1hours                   

			2. Get Lotus report from Scheduler sorted 
				by project start date    	1hours                   

		Make comparison                               	1hours                   

			1. Compare new information with last week's 
				report                                          

		Produce final report                      	8hours                   

			1. Make changes in Harvard Graphics file                                                    

			2. Delete completed projects over 
				2 weeks old                                               

			3 Sort by estimated shop date                                                               

			4. Print report                                                                             

			5. Make 4 complete copies                                                                   

			6. Make 1 copy with start dates                                                             

	Produce Project Status Report (weekly)                                                      

		Prepare report                              	3hours                   

			1. Query IFS-M                                                                              

			2. Print Report                                                                             

	Produce Project List (monthly)                                                              

		Query IFS-M                                    	2hours                   

			1. Run IFS-M query "L ACCT over 15K NO FH"                                                  

		Receive information from other sources     	30days                   

			1. Receive edited hard copies of previous 
				lists.                                            

			2. Receive other suggested changes.                                                         

		Update and Prepare Report                    	4hours                   

			1. Make changes in IFS-M                                                                    

			2. Make changes in dBase file                                                               

			3. Kathy copy dBase file to floppy 
				diskette and give to Gail                                

			4. Gail: Merge data                                                                         

			5. Gail: Print Project List                                                                 

			6. Distribute                                                                               



ESTIMATE WORK


Estimate Work Request                                           	Duration                 

	Perform Budget Estimate                                  	6days, 20min.            

		Do Budget Estimate                                                                          

			Examine Work Request                                                                        

				1. Do site visit of proposed work 	1hours                   

				2. Review with requestor the work 
					required                  	1hours                   

			Execute LOTUS 150 Spreadsheet                                                               

				1. Look up all information needed to 
					complete job in MEANS and	2hours                   
					historical data                                                                             

				2. Transfer information from MEANS 
					to LOTUS 150 spreadsheet.	1hours                   

				3. Spreadsheet automatically 
					calculates cost           	.5hour                   

			If NOT Reimbursable Work                                                                    

				1. Put in folder to accomplish detail 
					estimate or folder to hold 	10min.                   
					until further notice                                                                        

			If Reimbursable Work                                                                        

				1. Go into PROFS             		10min.                   

				2. Send work request to ask for 
					funds transfer             	.5hour                   

				3. Await receipt of funds        	1week                    

				4. Funds are received                                                                       

				5. Determine if work is inhouse 
					or contract               	1hour                    

		Retrieve information from 4283                		1hour                    

			1. Retrieve job site information, document 
				number, facility number, requestor 
				name and telephone number, and 
				information requested                                                                                   

	Perform Detailed Estimate                         		1day                     

		Define Phases                                    	2hour                    

		Estimate Phase Time                               	2hour                    

		Estimate Material Requirements                                                              

			1. Fill out Bill of Materials (IFS-M): 
				Labor hours for In-House & 		1hour                    
				Specifications for Contract                                                                 

			2. Fill out Purchase Request: In-House 
				for Supply & DOC for Contract		1hour                    
 
	Perform Determination of kind of Work                                                       

		1.  Is the work In-House                         	1hour                    

		2.  Is the work to be done by Contract          	1hour                    

Maintain Standards                                                                          

	Maintain Factors                                                                            

	Maintain Estimating Standards                                                               

	Maintain Supply Catalogue                                                                   





INSPECT WORK


In-House                                                           	1day                     

	1. Answer questions                                                                         

	2. Fill out inspection form                                                                 

Inspect Contract Work                                              	1day                     

	1. Answer questions                                                                         

	2. Fill out inspection form                                                                 



APPROVE WORK


Score 4283                                                         	1day                     

	1. Local Score (Eustis)                                                                     

	2. Use TRADOC system                                                                        

	3. BMAR Scoring                                                                             

Check funding                                                      	1hour                    

	1. Is the work funded                                                                       

	2. Is the work not funded                                                                   

Determine resources (manpower)                               		4hour                    

	1. In-House                                                                                 

	2. Contract                                                                                 

	3. U-DO-IT                                                                                  

	4. Troop                                                                                    

Estimator Scheduled                                                	1hour                    

	1. Chief, Production Control schedules job to an estimator                                  

Fund Approval                                                      	1week                    

	1. Get approval for materials                                                               

	2. Get approval for contract work                                                           

	3. Get approval for troop work                                                              

	4. Get approval to put job on hold                                                          

Work approval                                                                               

	1. Receive work approval                                 	1week                    

	2. If contract, send 4283 to DOC                     		1hour                    

	3. If inhouse, send 4283 to Supply/MC                   	1hour                    

	4. Send 4283 to shops (U-DO-IT, Troops, inhouse)		1hour                    



SCHEDULE WORK


Revise IFS-M                                                                                

	1. Get updated information from Chief, Production Control       	1hour                    

	2. Get updated information from DEH Warehouse                   	1hour                    

	3. Run Customer Service Menu query in IFS-M                     	1hour                    

	4. Letter N or O to bring up W/O & change status.                                           

	5. Change status in IFSM                                        	1hour                    

Revise LOTUS File                                                 		2hour                    

	1. Use IFS-M data to update LOTUS file                                                      

	2. Delete completed jobs                                                                    

	3. Delete cancelled jobs                                                                    

Send Work to Shops                                                 		1hour                    

	1. Send 4283 to shop                                                                        





MANAGE RPF UTILIZATION


Document RPF Utilization (ICARPUS) - Ft Eustis                		Duration - @25% time    

	Initiate update of report.                                                                  

		Review previous year's submission.               	8 hrs                    

		Separate out and copy sections by activity.     	4 hrs                    

		Access form for cover letter.                   	10 min                   

		Make changes to form letter as needed.         		30 min                   

     	Print out cover letter & route for signatures.     		20 min                   

		Enclose respective sections of report.         		4 hrs                    

		Send cover letter and sections to each activity 
			requesting updated information. 		1 hr                     
                                                                        
	Receive changes to report.                              	2-4 wks                  

	Incorporate changes received into final draft.                                              

		Access file of sections with changes.          		4 hrs                    

		Make changes and save in file.                		16 hrs                   

	Prepare final copy of report.                                                               

		Prepare copy of report for approval of Garrison 
			Cmdr., RPO, & DEH.                                                                                        

			Print out signature page.            		10 min                   

			Highlight changes on copy of report.      	3 hrs                    

			Attach signature page to copy & route for 
				signatures.              		10 min                   

			Receive copy with signatures & comments. 	1 wk                     

		Print out final copy of report.                   	1 hr                     

		Include updated photographs of facilities 
			as needed.               			4 hrs                    

     	Include cover for report binder.                     		5 min                    

	Prepare transmittal letter.                                                                 

		Access form for letter.                       		5 min                    

		Make changes to form letter as needed.       		10 min                   

		Print out transmittal letter & route for 
			signature.                			20 min                   

	Send final copy to TRADOC.                               	10 min                   

	Prepare report for distribution.                                                            

		Send copy of highlighted report to DOIM-Editorial.	10 min                   

		Receive proofed copy of report from DOIM-Ed.   		1-2 wks                  

		Make editorial changes to version on file & print.	4 hrs                    

	Prepare transmittal letter for distribution.                                                

		Access form for letter.                         	10 min                   

		Make changes to letter as needed.              		30 min                   

    		Print out letter & route for signature.        		20 min                   

		Send report to DOIM with printing & 
			distribution instructions.     			30 min                   

		Receive call from distribution point.            	16 hrs                   

		Attach "for official use only" cover on reports. 	1 hr                     

	File a copy of report.                                		10 min                   



MANAGE RPF UTILIZATION


Document RPF Utilization (ICARPUS) - Ft. Story                  	Duration - @25% time     

	Send previous year's submission to PAO with request for 
		update of information. 						10 min 

	Receive changes to report from PAO                       		2-4 wks                  

	Incorporate changes received into final copy of report                                      

		Access file of section with changes.            		4 hrs                    

		Make changes and save in file.                    		16 hrs                   

	Prepare final copy of report                                                                

		Prepare copy of report for approval of Garrison 
			Cmdr., RPO, & DEH                           

			Print out signature page.            			10 min                   

			Highlight changes on copy of report.    		3 hrs                    

			Attach signature page to copy & route 
				for signatures.              			10 min                   

			Receive copy with signatures & comments.  		2 wks                    

		Print out final copy of report.             			1 hr                     

		Include updated photographs of facilities 
			as needed.               				4 hrs                    

		Include cover for report binder.                		5 min                    

	Prepare transmittal letter.                                                                 

		Access form for letter.                          		5 min                    

   		Make changes to form letter as needed.        			10 min                   

		Print out transmittal letter & route 
			for signature.                				20 min                   

	Send final copy to TRADOC                               		10 min                   

	Prepare report for distribution.                                                            

		Send copy of highlighted report to DOIM-Editorial.		10 min                   

		Receive proofed copy of report from 
			DOIM-Editorial.						1-2 wks.                 

		Make editorial changes to version on file.       		4 hrs                    

		Prepare transmittal letter for distribution.                                                

			Access form for letter.                 		10 min                   

			Make changes to letter as needed.       		30 min                   

			Print out letter & route for signature. 		20 min                   

		Send report to DOIM with printing & distribution 
			instructions.     					30 min                   

		Receive call from distribution point.            		16 hrs                   

		Attach "for official use only" cover on reports.  		1 hr                     

	File a copy of report.                                  		10 min.                  



MANAGE RPF UTILIZATION


Control Space Allocation                                      		Duration - @25% time     

	Receive request for space.                                                                  

	Add request for space to agenda of next Facility/Space Management                           
Committee Meeting                                                                           

		Access file for agenda for next meeting.         	10 min                   

		Add request for space as a new agenda item.   		10 min                   

	Conduct meeting of Facility/Space Management Committee. 	quarterly                

	Relay decision of committee to requestor of space                                           

		Access form letter for response.                 	10 min                   

		Make changes to form letter as needed.         		20 min                   

		Print out letter & route for RPO signature.       	20 min                   

		Send letter to requestor.                       	10 min                   

	Set up meeting between RPO & Requestor to survey space                                      

		Contact requestor & get available dates/times     	20 min                   

		Check RPOs calendar & decide on date/time       	10 min                   

		Notify requestor of meeting date/time         		10 min                   

	Add property to gaining hand receipt                		1 wk 4 hrs               















PROCESS GRANT REQUIREMENTS


Process new request for lease for outgrant                     	Duration - @25% time     

	Receive letter of request from activity.                                                    

	Write letter of availability.                                                               

		Access form for letter of availability.         		10 min                   

		Make changes to form letter as needed.            		45 min                   

		Run letter with appropriate address.              		10 min                   

	Enclose report of availability.                                                             

		Access form for report of availability.          		10 min                   

		Customize information in form letter.           		35 min                   

		Print out report of availability.               		10 min                   

	Enclose an as-built drawing.                                                                

		Obtain original drawing of area.                		15 min                   

		Make 4-5 enlarged copies of specific area.       		15 min                   

		Identify area with a circle on all 4-5 copies.   		15 min                   

		Shade requested area with colored pencils 
			on all copies            				1 hr                     

	Enclose record of environmental consideration (REC).                                        

		Access form letter.                           			10 min                   

		Pull in pertinent paragraphs.                                                               

			Access file containing environmental 
				regulations.                  			10 min                   

			Retrieve specific paragraphs and 
				insert in REC.                    		20 min                   

	Produce Preliminary Assessment Screening form (PAS).                                        

		Access form for PAS.                          			10 min                   

		Fill in appropriate blanks.                      		20 min                   

	Route PAS to environmentalist for signature.            		4 hrs                    

	Route letter & enclosures with Publication Correspondence 
		Summary form 105 to Cmdr.                      			10 min                    

	Receive approved packet back from Cmdr.               			8 hrs                    

	Forward packet on to TRADOC for approval.             			10 min                   

	Receive copy of signed lease from activity.           			2 wks                    

	Update list of outgrants for ICARPUS.                 			30 min                   

		Access file containing list of outgrants.       		10 min                   

		Make changes to list as needed.                 		30 min                   

	File copy of signed lease.                            			15 min                   



PROCESS GRANT REQUIREMENTS


Process amendment of lease for outgrant                       	Duration - @25% time     

	Receive letter of request from activity.                                                    

	Write letter of availability.                                                               

		Access form for letter of availability.        			10 min                   

		Make changes to form letter as needed.         			45 min                   

		Run letter with appropriate address.            		10 min                   

	Enclose report of availability.                                                             

		Access form for report of availability.       			10 min                   

		Customize information in form letter.           		35 min                   

		Print out report of availability.                		10 min                   

	Enclose an as-built drawing.                                                                

		Obtain original drawing of area.               			15 min                   

		Make 4-5 enlarged copies of specific area.      		15 min                   

		Identify area with a circle on all 4-5 copies.    		15 min                   

		Shade requested area with colored pencils 
			on all copies            				1 hr                     

	Enclose record of environmental consideration (REC).                                        

		Access form letter.                            			10 min                   

		Pull in pertinent paragraphs.                                                               

			Access file containing environmental 
				regulations.                  			10 min                   

			Retrieve specific paragraphs and 
				insert in REC.                    		20 min                   

	Produce Preliminary Assessment Screening form (PAS).                                        

		Access form for PAS.                             		10 min                   

		Fill in appropriate blanks.                      		20 min                   

	Route PAS to environmentalist for signature.           			4 hrs                    

	Route letter & enclosures with Publication 
		Correspondence Summary form 105 to Cmdr. 			10 min                   

	Receive approved packet back from Cmdr.                  		8 hrs                    

	Forward packet on to TRADOC for approval.                		10 min                   

	Receive copy of signed lease from activity.             		2 wks                    

	Update list of outgrants for ICARPUS.                 			30 min                   

		Access file containing list of outgrants.        		10 min                   

		Make changes to list as needed.                			30 min                   

	File copy of signed lease.                             			15 min                   



PROCESS GRANT REQUIREMENTS


Process renewal of lease for outgrant.                         	Duration - @25% time     

	Receive letter of request from activity.                                                    

	Write letter of availability.                                                               

		Access form for letter of availability.      		10 min                   

		Make changes to form letter as needed.           	45 min                   

		Run letter with appropriate address.          		10 min                   

	Enclose report of availability.                                                             

		Access form for report of availability.         	10 min                   

		Customize information in form letter.           	35 min                   

		Print out report of availability.                	10 min                   

	Enclose record of environmental consideration (REC).                                        

		Access form letter.                            		10 min                   

		Pull in pertinent paragraphs.                                                               

			Access file containing environmental 
				regulations.                  		10 min                   

			Retrieve specific paragraphs 
				and insert in REC.                 	20 min                   

	Produce Preliminary Assessment Screening form (PAS).                                        

		Access form for PAS.                            	10 min                   

		Fill in appropriate blanks.                      	20 min                   

	Route PAS to environmentalist for signature.          		4 hrs                    

	Route letter & enclosures with Publication 
		Correspondence Summary form 105 to Cmdr.  		10 min                   
 
	Receive approved packet back from Cmdr.                 	8 hrs                    

	Forward packet on to TRADOC for approval.              		10 min                   

	Receive copy of signed lease from activity.              	2 wks                    

	Update list of outgrants for ICARPUS.                  		30 min                   

		Access file containing list of outgrants.         	10 min                   

		Make changes to list as needed.                  	30 min                   

	File copy of signed lease.                              	15 min                   



PROCESS GRANT REQUIREMENTS


Coordinate ingrant requests.                                  		Duration - @25% time     

	Receive request for ingrant lease and completed 4283.                                       

	Produce Purchase Request Commitment form 3953.                                              

		Access blank form 3953.                           		10 min                   

		Input data from form 4283 into form 3953 as 
			applicable.           	 				30 min                   

		Print form 3953.                                 		10 min                   

	Route form 3953 to Comptroller for addition of funding   		10 min.                  
		information.                                                                                

	Receive completed form 3953.                            		2 wks                    

	File form 3953.                                        			10 min                   

	Update list of ingrants for ICARPUS.                                                        

		Access file containing list of ingrants.        		10 min                   

		Make changes to list as needed.                  		20 min                   
		


PERFORM SPACE MANAGEMENT


Produce utilization of admin/storage space report              	Duration - @25% time     

	Write letter to HRHs requesting updated information.                                        

		Access form letter.                             		10 min                   

		Make changes to form letter as needed.          		20 min                   

		Access list of HRHs.                              		10 min                   

		Merge two files for personalized form letter.   		20 min                   

		Enclose blank TCFE 1061.                         		10 min                   

		Enclose blank TCFE 1061A.                        		10 min                   

		Run off and enclose current hand receipt.        		2 hrs                    

	Receive signed and dated hand receipt and forms.       			2 wks                    

	Enter updated information in Hand Receipt Directory.                                        

		Access Hand Receipt Directory file.             		10 min                   

		Update information in file.                    			20 min                   

		Enter date of last sign off on hand receipt.    		10 min                   

	Enter updated information in POC/Ph#/Date list.                                             

		Access POC/Ph#/Date file.                        		10 min                   

		Update information in file.                    			20 min                   

	Compile information from TCFE 1061 & 1061A into DD 805.                                     

		Gather information needed from completed 
			1061s & 1061As.           				30 min                   

		Access DD 805 report software.                    		10 min                   

		Enter data in screens.                            		1 hr                     

	Transmit information contained in DD 805 to HQ DA.     			1 hr                     

	Print out report for files.                            			30 min                   



PERFORM SPACE MANAGEMENT


Maintain facility hand receipts                                		Duration - @25% time     

	Receive notification of change to hand receipt.                                             

	Set up meeting between RPO and losing HRH.                                                  

		Contact losing HRH & get available dates/times 
			for meeting.        					15 min                   

		Check RPOs calendar & decide on date/time.			15 min                   

		Notify losing HRH of meeting date/time.          		5 min                    

	Complete TCFE Supply/AR405-70 (Facility Assign & Clearance                                  
Record)                                                                                     

		Fill in blanks on form appropriate for losing HR.		1 hr                     

		Send form to losing HRH for completeness of 
			information and signature.              		10 min                   

		Receive signed TCFE Supply/AR405-70 from 
			losing HRH.               				1 wk                     

		Fill in blanks on form appropriate for gaining HR.		1 hr                     

		Send form to gaining HRH for completeness and 
			signature.           					10 min                   

		Receive signed TCFE Supply/AR405-70 from 
			gaining HRH.              				1 wk                     

		Get RPO signature on both forms for final 
			approval.                				5 min                    

	Meet with losing HRH                                                                        

		Inspect facility being transferred with 
			losing HRH.                				1 hr                     

		Verify information about facility on TCFE 
			Supply/AR405-70.         				15 min                   

		Collect facility keys.                           		5 min                    

	Remove property from losing hand receipt                                                    

		Open up file for losing hand receipt.           		10 min                   

		Remove facility being transferred from hand 
			receipt.               					5 min                    

		Run off updated hand receipt.                   		10 min                   

		Send updated hand receipt to losing HRH for 
			acceptance and signature.               		10 min                   

		Receive signed hand receipt.                    		1 wk                     

		File hand receipt in appropriate file.        			5 min                    

	Set up meeting between RPO and gaining HRH                                                  

		Contact gaining HRH & get available dates/times 
			for meeting.       					15 min                   

		Check RPOs calendar and decide on date/time.    		15 min                   

		Notify gaining HRH of meeting date/time.         		5 min                    

	Meet with gaining HRH                                                                       

		Inspect facility being transferred with 
			gaining HRH.               				1 hr                     

		Verify information about facility on TCFE 
			Supply/AR405-70.         				15 min                   

		Sign over facility to gaining HRH                 		5 min                    

		Issue facility keys to gaining HRH                		5 min                    

	Add property to gaining hand receipt                                                        

		Open up file for gaining hand receipt.         			10 min                   

		Add facility being transferred to hand receipt. 		5 min                    

		Run off updated hand receipt.                    		10 min                   

		Send updated hand receipt to gaining HRH for 
			acceptance and signature.             			10 min                   

		Receive signed hand receipt.                     		1 wk                     

		File hand receipt in appropriate file.            		5 min                    

	Make changes to building list (blue cover)                                                  

		Locate transferred facility in building list.  			5 min                    

		Change HRH for building.                          		5 min                    

		Change other information as needed for list.      		10 min                   

	Make changes to IFS-M                                                                       

		Get copy of completed TCFE Supply/AR405-70 for 
			losing and gaining HRs. 				10 min                                                                                                           

		Do a query on IFS-M to locate building being 
			transferred.          					5 min                    

		Make changes to appropriate fields in IFS-M 
			as needed.             					10 min                   



ACCOMPLISH RPF DISPOSAL


Identify candidate for disposal                               		Duration - @25% time     

	Initiate selection process for disposal                                                     

		Review potential candidates for disposal from 
			reduction in facilities program. 		1 hr                     

		Rank potential candidates based on pre-determined 
			criterion (age, condition, etc) 		1 hr                     

		Select candidate                                 	30 min                   

Initiate disposal approval                                                                  

	Prepare HUD survey                                                                          

		Open up survey form                            		10 min                   

		Access building information file            		10 min                   

		Fill in blanks with data specific to building 
			candidate for demolition 			45 min                   
 
		Make copy of survey for files                    	10 min                   

	Send HUD survey to DA thru TRADOC                      		10 min                   

	Receive report from HUD on suitability of building 
		for reuse       					30-90 days               

Coordinate Disposal                                                                         

	Write Letter for Commander's signature to remove from inventory                             

		Access form letter                               	10 min                   

		Make changes to form letter as needed           	20 min                   

		Print out letter                                	10 min                   

		Route letter to Commander for signature         	10 min                   

		Receive signed letter from Cmdr.                	8 hrs                    

	Prepare 1354 for removal of building from IFS-M                                             

		Access form 1354                               		10 min                   

		Fill in appropriate blocks                      	45 min                   

		Verify data in blocks                           	1 hr                     

		Get RPO signature                                 	20 min                   

		Route through appropriate channels              	1 wk                     

	Prepare GSA 4283 (Work Control) for building shutdown                                       

		Access form 4283                             		10 min                   

		Fill in appropriate blocks (shut off util, etc)   	45 min                   

		Route to RPO for signature.                      	5 min                    

		Receive signed form from RPO                    	20 min                   

		Make a copy for file                          		10 min                   

	Prepare DA 377 (Building Detail Report)                                                     

		Access form 377                                		10 min                   

		Fill in appropriate blocks                     		45 min                   

		Route for signatures.                          		10 min                   

		Receive signed form.                            	4 hrs                    

		Make a copy for files                         		10 min                   

	If estimated cost is < $25,000, send form to 
		Installation Commander  for approval 			10 min                   
 
	If estimated cost is > $25,000, send form to TRADOC for approval                            

	Pass approval form to EP&S for contract for demolition 	
									10 min                   

Query/document disposal                                                                     

	Receive 1354 for removal of building from IFS-M     		1 wk                     

   	Verify data on 1354                                    		1 hr                     

	Remove building information from IFS-M                  	1 hr                     



Back to Table of Contents

Back to KWS Home Page


APPENDIX I - FT. EUSTIS KNOWLEDGE BASE


Event/Task/Step Description                                  DoIt Developed                 

COORDINATE WORK                                                                             

Customer Generate Work Order                                                                

Receive 4283                                                                                

1) Verify 4283                                                                              

2) Route 4283 to Environmental Office                                                       

3) Route 4283 to Safety Office                                                              

4) Input 4283 into IFSM.                                     		YES                            

Establish & Maintain Work Request                                                           

Provide Work Status                                                                         

Produce Production Shop Report                                                              

a) Get New Information                                                                      

1) Perform steps 2 through N.                               		 YES                            

2)   Get information from IFSM.                                                             

3)   Get information from Scheduler's Lotus report.                                         

b) Verify Information                                                                       

1) Verify and correct information.                           		YES                            

c) Produce Report                                                                           

1) Perform steps 2 and 3.                                    		YES                            

2)   Sort projects by estimated date to shop.                                               

3)   Remove projects that have been completed for over 2                                    
weeks.                                                                                      

4) Perform steps 5 through 6.                                		YES                            

5)   Generate complete report.                                                              

6)   Print copy of complete report.                                                         

7) Make 6 copies of the complete report.                                                    

8) Perform steps 9 and 10.                                   		YES                            

9)   Generate subset of report for Supply.                                                  

10)   Print copy of Supply report.                                                          

11) Make 2 copies of Supply report.                                                         

12) Perform steps 12 and 13.                                 		YES                            

13)   Generate subset of report for Shop.                                                   

14)   Print copy of Shop report.                                                            

15) Make 2 copies of Shop report.                                                           

Produce Project Status Report                                                               

Prepare Report                                                                              

1) Perform steps 2 through N.                                		YES                            

2)   Access IFSM.                                                                           

3)   Run IFSM Query for project status.                                                     

4)   Print report                                                                           

Produce Project List Report                                                                 

a) Receive Information from other Sources                                                   

1) Receive edited hard copies of previous lists                                             

2) Receive other suggested changes                                                          

b) Update and Query IFSM                                                                    

1) Make any needed changes to IFSM.                          		YES                            

2) Perform steps 3 through 5.                               		YES                            

3)   Connect to IFSM.                                                                       

4)   Run IFSM query "L ACCT over 15K NO FH".                                                

5)   Create dBase database.                                                                 

c) Update and Prepare Report                                                                

1) Make changes in dBase file                                		YES                            

2) Kathy  copy dBase file to floppy diskette & give to Gail  
									YES                            


3) Gail  Merge data                                                                         

4) Gail  Print project list                                                                 

5) Distribute report                                                                        




ESTIMATE WORK                                                                               

Estimate Work Request                                                                       

Perform Budget Estimate                                                                     

Do Budget Estimate                                                                          

Examine Work Request                                                                        

1) Do a site visit of proposed work                                                         

2) Review with requestor the work required                                                  

Execute LOTUS 150 spreadsheet                                                               

1) Look up all information needed to complete job.                                          

2) Transfer information from MEANS to Lotus 150                                             
Spreadsheet.                                                                                

3) Spreadsheet automatically calculates cost                	 	YES                            

If Not Reimbursable Work                                                                    

1) Put in folder to accomp. detail est. or folder to hold                                   
until further notice                                                                        

If Reimbursable Work Unit                                                                   

1) Perform steps 2 and 3.                                    		YES                            

2)   Go into PROFS                                                                          

3)   Send work request  to ask for funds transfer                                           

4) Await receipt of funds                                                                   

5) Funds are received                                                                       

6) Determine if work is inhouse or contract                                                 

Retrieve Information from 4283                                                              

1) Perform steps 2 through 7.                                		YES                            

2)   Access IFSM.                                                                           

3)   Retrieve job site information                                                          

4)   Retrieve document number                                                               

5)   Retrieve facility number                                                               

6)   Retrieve requestor name and telephone number                                           

7)   Retrieve information requested                                                         

Perform Detailed Estimate                                                                   

a) Define Phases                                                                            

b) Estimate Phase Time                                                                      

c) Estimate Material Requirements                                                           

1) Fill out Bill of Materials (IFSM) Labor hours for         		YES                            
inhouse, Specs for contract                                                                 

2) Perform steps 3 through 6.                                		YES                            

3)   Access IFSM.                                                                           

4)   Use query to download Bill of Materials.                                               

5)   Use WP and merge files to fill out purchase request.                                   

6)   Purchase request: inhouse for supply, DOC for contract                                 


Perform Determination of Kind of Work                                                       

1) Is the work inhouse                                                                      

2) Is the work to be done by contract                                                       

Maintain Standards                                                                          

Maintain Factors                                                                            

Maintain Estimating Standards                                                               

Maintain Supply Catalog                                                                     




INSPECT WORK                                                                                

Inspect InHouse Work                                                                        

1) Answer questions                                                                         

2) Fill out inspection form                                                                 

Inspect Contract Work                                                                       

1) Answer questions                                                                         

2) Fill out inspection form                                                                 




APPROVE WORK                                                                                

4283 Scoring                                                		YES                            

1) Local score (Eustis)                                      		YES                            

2) Use TRADOC system                                         		YES                            

3) BMAR scoring                                                                             

Check Funding                                                                               

1) Is the work funded?                                                                      

2) Is the work not funded?                                                                  

Determine Resources (manpower)                                                              

1) InHouse                                                                                  

2) Contract                                                                                 

3) UDOIT                                                                                    

4) Troop                                                                                    

Estimator Scheduled                                                                         

1) Chief, Production Control schedules job to an estimator                                  

Fund Approval                                                                               

1) Get approval for materials                                                               

2) Get approval for contract work                                                           

3) Get approval for troop work                                                              

4) Get approval to put job on hold                                                          

Work Approval                                                                               

1) Receive work approval                                                                    

2) If contract, send 4283 to DOC                                                            

3) If inhouse, send 4283 to Supply/MC                                                       

4) Send 4283 to shops (UDOIT, Troops, InHouse)                                              




SCHEDULE WORK                                                                               

Revise IFSM                                                                                 

1) Get updated information from Chief, Production Control                                   

2) Get updated information from DEH warehouse                                               

3) Perform steps 4 through 6.                                		YES                            

4)   Run Customer Service Menu query in IFSM                                                

5)   Letter N or O to bring up W/O                                                          

6)   Change status in IFSM                                                                  

Revise LOTUS File                                                                           

1) Use IFSM data to update LOTUS file                        		YES                            

2) Perform steps 3 through N.                                		YES                            

3)   Update information.                                                                    

4)   Delete completed jobs                                                                  

5)   Delete cancelled jobs                                                                  

Send Work to Shops                                                                          

1) Send 4283 to appropriate shops                                                           




                                                                                            
Event/Task/Step Name                                         DoIt Developed                 

MANAGE RPF UTILIZATION                                                                      

Document RPF Utilization (ICARPUS)                                                          

ICARPUS - Ft. Eustis                                                                        

Initiate update of report.                                                                  

Review previous year's submission.                                                          

Separate out and copy sections by activity.                                                 

Access form for cover letter.                               		YES                            

Make changes to form letter as needed.                                                      

Print out cover letter & route for signatures.                                              

Enclose respective sections of report.                                                      

Send cover letter and sections to each activity requesting                                  
updated information.                                                                        

Receive changes to report.                                                                  

Incorporate changes received into final draft.                                              

Access file of sections with changes.                        		YES                            

Make changes and save in file.                                                              

Prepare final copy of report.                                                               

Prepare copy of report for approval of Garrison Cmdr., RPO,                                 
& DEH.                                                                                      

Print out signature page.                                    		YES                            

Highlight changes on copy of report.                                                        

Attach signature page to copy & route for signatures.                                       

Receive copy with signatures & comments.                                                    

Print out final copy of report.                                                             

Include updated photographs of facilities as needed.                                        

Include cover for report binder.                                                            

Prepare transmittal letter.                                                                 

Access form for letter.                                      		YES                            

Make changes to form letter as needed.                                                      

Print out transmittal letter & route for signature.                                         

Send final copy to TRADOC.                                                                  

Prepare report for distribution.                                                            

Send copy of highlighted report to DOIM-Editorial.                                          

Receive proofed copy of report from DOIM-Ed.                                                

Make editorial changes to version on file & print. 			YES                            

Prepare transmittal letter for distribution.                                                

Access form for letter.                                      		YES                            

Make changes to letter as needed.                                                           

Print out letter & route for signature.                                                     

Send report to DOIM with printing & distribution                                            
instructions.                                                                               

Receive call from distribution point.                                                       

Attach "for official use only" cover on reports.                                            

File a copy of report.                                                                      

Document RPF Utilization (ICARPUS) - Ft. Story                                              

Send previous year's submission to PAO with request for                                     
update of information.                                                                      

Receive changes to report from PAO                                                          

Incorporate changes received into final copy of report                                      

Access file of section with changes.                         		YES                            

Make changes and save in file.                                                              

Prepare final copy of report                                                                

Prepare copy of report for approval of Garrison Cmdr., RPO,                                 
& DEH                                                                                       

Print out signature page.                                    		YES                            

Highlight changes on copy of report.                                                        

Attach signature page to copy & route for signatures.                                       

Receive copy with signatures & comments.                                                    

Print out final copy of report.                              		YES                            

Include updated photographs of facilities as needed.                                        

Include cover for report binder.                                                            

Prepare transmittal letter.   
Prepare transmittal letter. Access form for letter.			YES
Make changes to form letter as needed.
Print out transmittal letter & route for signature.
Send final copy to TRADOC.
Prepare report for distribution.
Send copy of highlighted report to DOIM-Editorial.
Receive proofed copy of report from DOIM-Ed.
Make editorial changes to version on file & print. 			YES
Prepare transmittal letter for distribution.
Access form for letter. 						YES
Make changes to letter as needed.
Print out letter & route for signature.
Send report to DOIM with printing & distribution instructions.
Receive call from distribution point.
Attach "for official use only" cover on reports.
File a copy of report.
Document RPF Utilization (ICARPUS) - Ft. Story
Send previous year's submission to PAO with request for 
	update of information.
Receive changes to report from PAO
Incorporate changes received into final copy of report
Access file of section with changes. 					YES
Make changes and save in file.
Prepare final copy of report
Prepare copy of report for approval of Garrison Cmdr., 
	RPO, & DEH
Print out signature page. 						YES
Highlight changes on copy of report.
Attach signature page to copy & route for signatures.
Receive copy with signatures & comments.
Print out final copy of report. 					YES
Include updated photographs of facilities as needed.
Include cover for report binder.
Prepare transmittal letter.
Access form for letter. 						YES
Make changes to form letter as needed.
Print out transmittal letter & route for signature.
Send final copy to TRADOC
Prepare report for distribution.
Send copy of highlighted report to DOIM-Editorial.
Receive proofed copy of report from DOIM-Editorial.
Make editorial changes to version on file. 				YES
Prepare transmittal letter for distribution.
Access form for letter. 						YES
Make changes to letter as needed.
Print out letter & route for signature.
Send report to DOIM with printing & distribution instructions.
Receive call from distribution point.
Attach "for official use only" cover on reports.
File a copy of report.
Control Space Allocation
Receive request for space.
Add request for space to agenda of next Facility/Space 
	Management Committee Meeting
Access file for agenda for next meeting. 				YES
Add request for space as a new agenda item.
Conduct meeting of Facility/Space Management Committee.
Relay decision of committee to requestor of space
Access form letter for response. 					YES
Make changes to form letter as needed.
Print out letter & route for RPO signature.
Send letter to requestor.
Set up meeting between RPO & Requestor to survey space
Contact requestor & get available dates/times
Check RPOs calendar & decide on date/time
Notify requestor of meeting date/time
Add property to gaining hand receipt
PROCESS GRANT REQUIREMENTS 
Process new request for lease for outgrant
Receive letter of request from activity.
Write letter of availability.
Access form for letter of availability. 				YES
Make changes to form letter as needed.
Run letter with appropriate address.
Enclose report of availability.
Access form for report of availability. 				YES
Customize information in form letter.
Print out report of availability.
Enclose an as-built drawing.
Obtain original drawing of area.
Make 4-5 enlarged copies of specific area.
Identify area with a circle on all 4-5 copies.
Shade requested area with colored pencils on all copies
Enclose record of environmental consideration (REC).
Access form letter. 							YES
Pull in pertinent paragraphs.
Access file containing environmental regulations.
Retrieve specific paragraphs and insert in REC.
Produce Preliminary Assessment Screening form (PAS).
Access form for PAS.
Fill in appropriate blanks.
Route PAS to environmentalist for signature.
Route letter & enclosures with Publication Correspondence 
	Summary form 105 to Cmdr.
Receive approved packet back from Cmdr.
Forward packet on to TRADOC for approval.
Receive copy of signed lease from activity.
Update list of outgrants for ICARPUS.
Access file containing list of outgrants. 				YES
Make changes to list as needed.
File copy of signed lease.
Process amendment of lease for outgrant
Receive letter of request from activity.
Write letter of availability.
Access form for letter of availability. 				YES
Make changes to form letter as needed.
Run letter with appropriate address.
Enclose report of availability.
Access form for report of availability. 				YES
Customize information in form letter.
Print out report of availability.
Enclose an as-built drawing.
Obtain original drawing of area.
Make 4-5 enlarged copies of specific area.
Identify area with a circle on all 4-5 copies.
Shade requested area with colored pencils on all copies
Enclose record of environmental consideration (REC).
Access form letter. 							YES
Pull in pertinent paragraphs.
Access file containing environmental regulations.
Retrieve specific paragraphs and insert in REC.
Produce Preliminary Assessment Screening form (PAS).
Access form for PAS.
Fill in appropriate blanks.
Route PAS to environmentalist for signature.
Route letter & enclosures with Publication Correspondence 
	Summary form 105 to Cmdr.
Receive approved packet back from Cmdr.
Forward packet on to TRADOC for approval.
Receive copy of signed lease from activity.
Update list of outgrants for ICARPUS.
Access file containing list of outgrants. 				YES
Make changes to list as needed.
File copy of signed lease.
Process renewal of lease for outgrant.
Receive letter of request from activity.
Write letter of availability.
Access form for letter of availability. 				YES
Make changes to form letter as needed.
Run letter with appropriate address.
Enclose report of availability.
Access form for report of availability. 				YES
Customize information in form letter.
Print out report of availability.
Enclose record of environmental consideration (REC).
Access form letter. 							YES
Pull in pertinent paragraphs.
Access file containing environmental regulations.
Retrieve specific paragraphs and insert in REC.
Produce Preliminary Assessment Screening form (PAS).
Access form for PAS.
Fill in appropriate blanks.
Route PAS to environmentalist for signature.
Route letter & enclosures with Publication Correspondence 
	Summary form 105 to Cmdr.
Receive approved packet back from Cmdr.
Forward packet on to TRADOC for approval.
Receive copy of signed lease from activity.
Update list of outgrants for ICARPUS.
Access file containing list of outgrants. 				YES
Make changes to list as needed.
File copy of signed lease.
Coordinate ingrant requests.
Receive request for ingrant lease and completed 4283.
Produce Purchase Request Commitment form 3953.
Access blank form 3953.
Input data from form 4283 into form 3953 as applicable.
Print form 3953.
Route form 3953 to Comptroller for addition of funding information.
Receive completed form 3953.
File form 3953.
Update list of ingrants for ICARPUS.
Access file containing list of ingrants. 				YES
Make changes to list as needed.
PERFORM SPACE MANAGEMENT 
Produce utilization of admin/storage space report
Write letter to HRHs requesting updated information.
Access form letter. 							YES
Make changes to form letter as needed.
Access list of HRHs.
Merge two files for personalized form letter.
Enclose blank TCFE 1061.
Enclose blank TCFE 1061A.
Run off and enclose current hand receipt.
Receive signed and dated hand receipt and forms.
Enter updated information in IFS-M.
1) Perform steps 2 through 4. 						YES
2) Update Hand Receipt information in IFS-M.
3) Update POC/Ph#/Date information in IFS-M.
4) Enter date of last sign off on hand receipt.
Compile information from TCFE 1061 & 1061A into DD 805.
Gather information needed from completed 1061s & 1061As.
Access DD 805 report software. 						YES
Enter data in screens.
Transmit information contained in DD 805 to HQ DA.
Print out report for files.
Maintain facility hand receipts
Receive notification of change to hand receipt.
Set up meeting between RPO and losing HRH.
Contact losing HRH & get available dates/times for meeting.
Check RPOs calendar & decide on date/time.
Notify losing HRH of meeting date/time.
Complete TCFE Supply/AR405-70 (Facility Assign & Clearance Record)
Fill in blanks on form appropriate for losing HR.
Send form to losing HRH for completeness of information and signature.
Receive signed TCFE Supply/AR405-70 from losing HRH.
Fill in blanks on form appropriate for gaining HR.
Send form to gaining HRH for completeness and signature.
Receive signed TCFE Supply/AR405-70 from gaining HRH.
Get RPO signature on both forms for final approval.
Meet with losing HRH
Inspect facility being transferred with losing HRH.
Verify information about facility on TCFE Supply/AR405-70.
Collect facility keys.
Remove property from losing hand receipt
Open up file for losing hand receipt.
Remove facility being transferred from hand receipt.
Run off updated hand receipt.
Send updated hand receipt to losing HRH for acceptance and signature.
Receive signed hand receipt.
File hand receipt in appropriate file.
Set up meeting between RPO and gaining HRH
Contact gaining HRH & get available dates/times for meeting.
Check RPOs calendar and decide on date/time.
Notify gaining HRH of meeting date/time.
Meet with gaining HRH
Inspect facility being transferred with gaining HRH.
Verify information about facility on TCFE Supply/AR405-70.
Sign over facility to gaining HRH
Issue facility keys to gaining HRH
Add property to gaining hand receipt
Open up file for gaining hand receipt.
Add facility being transferred to hand receipt.
Run off updated hand receipt.
Send updated hand receipt to gaining HRH for acceptance and signature.
Receive signed hand receipt.
File hand receipt in appropriate file.
Make changes to building list (blue cover)
Locate transferred facility in building list.
Change HRH for building.
Change other information as needed for list.
Make changes to IFS-M
Get copy of completed TCFE Supply/AR405-70 for losing and gaining HRs.
Do a query on IFS-M to locate building being transferred.
Make changes to appropriate fields in IFS-M as needed.
ACCOMPLISH RPF DISPOSAL 
Identify candidate for disposal
Initiate selection process for disposal
Review potential candidates for disposal from reduction in facilities program.
Rank potential candidates based on pre-determined criterion (age, condition, etc)
Select candidate
Initiate disposal approval
Prepare HUD survey
Open up survey form
Access building information file
Fill in blanks with data specific to building candidate for demolition
Make copy of survey for files
Send HUD survey to DA thru TRADOC
Receive report from HUD on suitability of building for reuse
Coordinate Disposal
Write Letter for Commander's signature to remove from inventory
Access form letter
Make changes to form letter as needed
Print out letter
Route letter to Commander for signature
Receive signed letter from Cmdr.
Prepare 1354 for removal of building from IFS-M
Access form 1354
Fill in appropriate blocks
Verify data in blocks
Get RPO signature
Route through appropriate channels
Prepare GSA 4283 (Work Control) for building shutdown
Access form 4283
Fill in appropriate blocks (shut off util, etc)
Route to RPO for signature.
Receive signed form from RPO
Make a copy for file
Prepare DA 377 (Building Detail Report)
Access form 377
Fill in appropriate blocks
Route for signatures.
Receive signed form.
Make a copy for files
If estimated cost is < $25,000, send form to Installation Commander for approval
If estimated cost is > $25,000, send form to TRADOC for approval
Pass approval form to EP&S for contract for demolition
Query/document disposal
Receive 1354 for removal of building from IFS-M
Verify data on 1354
Remove building information from IFS-M
Back to Table of Contents

Back to KWS Home Page


APPENDIX J - HARDWARE AND SOFTWARE PURCHASED FOR FT. EUSTIS

Server Hardware and Software

Compaq System Pro Server

320/520 Meg Tape Drive

Oracle V6 (including support)

Banyan Vines

Vines 4.11 (5)

LAN Server to Server

Network Management

1 Network Copy of LanShark Mail

1 HP IIP LaserJet Printer

2 HP Font Cartridges

Notes:

The tape drive is required for periodic backups of the server. Oracle V6 includes one year of support. The Vines software is the current version being run at Ft. Eustis and is required to connect the database server to the existing Banyan network being run at Ft. Eustis. The LAN Server to Server option is required for every server in a multi-server LAN environment. The Network Management option is required for every server if that option is being run on the existing LAN and per Mike West, Ft. Eustis uses the Network Management option.

Ft. Eustis Equipment

Description of Equipment:

ACROS Model 4365

486DX/33MHz Personal Computer

8 MB RAM

240 MB Hard Disk

3.5" 1.44 MB Floppy Disk Drive

5.25" 1.2 MB Floppy Disk Drive

SVGA (1024x768, 16 Colors) Graphics Adapter

Two Serial Ports, One Parallel Port, and One PS/2 Mouse Port

Four 16-bit Expansion Slots

101-Key Enhanced Keyboard

Logitech PS/2 Mouse

9600 Baud Internal Fax Modem

ACROS Preloaded Software

MS-DOS 5.0

Windows 3.1

PFS: Windows Works

Prodigy Service Startup Kit

Fax and Data Communication

CERL Purchased and Loaded Software

QEMM 6.0

WordPerfect for Windows

Harvard Graphics for Windows

Lotus 1-2-3 for Windows

AcerView 11D 14" Super VGA Color Monitor

References

Sassone, Peter G., "Cost Benefit Methodology for Office systems," ACM Transactions on Office Information Systems, July 1987, Vol. 5, No. 3.

Thomas, B. E., Baron, J. P. and Schmidt, W. J. Evaluating A Performance Support Environment for Knowledge Workers, USACERL Technical Report, in progress.